Resources
Displaying 1211 - 1220 of 1295
Last updated: 11 Apr 2023
20220905 Transpower submission to EECA Green paper.pdf
… to EECA 3 These findings were supported by an independent report commissioned by the System Operator - Distributed … peak. This can prevent the additional build of generation, transmission and distribution infrastructure necessary to … trader), or a network or system operator (distribution or transmission). When the charging is managed at an aggregated …
Last updated: 06 Nov 2024
Presentation - 2024 System Operator Asset Owner Engineering Forum.pdf
… 0DeliveryNew feederWhakatu 20DeliveryTransmissionCML-FKN-A 0DeliveryNew transformerCromwell … • Will reference other existing material – not duplicate • Planning to publish first iteration when ready then update … • Running studies and analysing results • Producing study reports, reviewing and updating reports IN-CONFIDENCE: …
Last updated: 17 Oct 2023
UG-SD-1071 SO Register Asset Owner User Guide.pdf
… that this non-compliance may have on the System Operator planning to comply, and comply, with their Principal … onto New Zealand’s electricity system, plus a summary of transmission charges. Connection Study Guide for Connecting … Estimate acceptance Engineering assessment Assessment Report review Report approval Draft decision Consultation …
Last updated: 21 May 2024
Market Operations - Weekly Market Movements - 19 May 2024.pdf
… outages that may reduce generation margins. The latest NZGB report is available on the NZGB website. Electricity Market … (Geomagnetically Induced Current or GIC) to flow in transmission circuits. These currents can flow to ground … in power systems with significant lengths of east-west transmission lines, as these are perpendicular to magnetic …
Last updated: 05 Feb 2021
7. 01 Oct 2020 - TPM Development Checkpoint 1 re-submission to the Electricity Authority (Benefit-Based Charge).pdf
… the cost of all investments in the interconnected grid to transmission customers in proportion to their net private … review and consultation cycle (e.g. align with Transmission Planning Report cycle) MBIE’s Electricity Demand & Generation …
Last updated: 27 Jan 2021
7. 01 Oct 2020 TPM Development Checkpoint 1 re-submission to the Electricity Authority (Benefit-Based Charge).pdf
… the cost of all investments in the interconnected grid to transmission customers in proportion to their net private … review and consultation cycle (e.g. align with Transmission Planning Report cycle) MBIE’s Electricity Demand & Generation …
Last updated: 09 Sep 2025
HVDC MCP - Attachment 9 - TPM and Indicative Pricing Impacts
… PROGRAMME (STAGE 1) | MCP Application 2 Purpose Under the transmission pricing methodology (TPM),1 the covered costs2 … investments in interconnection assets and interconnection transmission alternatives (post-2019 benefit-based … and Generation Scenarios Attachment 3 – Cable Condition Report Attachment 4 – Short-list of Investment Options …
Last updated: 27 May 2022
Mercury submission draft assumptions book 26 May 2022.pdf
… is developing the draft assumptions book under the new transmission pricing methodology (TPM) to support the … is unlikely to be true simply because the forecast values reported in the table are at best (if at all) an …
Last updated: 05 Apr 2019
Modelling Requirements_release.pdf
… 14 5.3 Validation Report … 23 Appendix 2: Validation Report Template … where a transformer steps up the voltage to a desirable transmission level to connect to the power system. The … to model the network inside the wind plant for the planning and operation studies mentioned in Section 2.3 …
Last updated: 24 May 2022
Market Operations - Weekly Market Movements - 22 May 2022.pdf
… The NI-WCM assesses the adequacy of generation and HVDC transmission capacity to meet peak winter North Island … [email protected] Hydro data used in this report is sourced from NZX Hydro. Electricity risk curves …