Resources
Displaying 221 - 230 of 1234
Last updated: 04 Feb 2025
Market Operations - Weekly Report - 2 February 2025
… Power BI Desktop Market Operations Weekly Report - Week Ended 2 February 2025 TRANSPOWER // MARKET … GWh was sent north and 4 GWh was sent south. Transpower is planning an outage on the HVDC link on 8 February ahead of … base load generation – exceeds the demand or the regional transmission capacity to export generation. In these cases, …
Market Operations - Weekly Report - 2 February 2025.pdf
(PDF 2.63 MB)
Last updated: 20 Aug 2018
Monthly HVDC Utilisation Report July 2018.pdf
… MARKET MATTERS HVDC UTILISATION REPORT JULY 2018 HVDC Utilisation In late 2016 we published … capacity. The key factors limiting utilisation are: a) Transmission constraints (including AC and DC constraints), … separation caused by either of the above 2 factors. a) Transmission constraints Transmission constraints limit the …
Monthly HVDC Utilisation Report July 2018.pdf
(PDF 1.08 MB)
Last updated: 16 Nov 2023
KPMG WUNIVM1b assurance report.pdf
… All rights reserved. Independent Reasonable Assurance Report to the General Counsel and Company Secretary of … been formed on the basis of the matters outlined in this report. In our opinion, in all material respects — the … Book”) dated 16 March 2023 and the requirements of the Transmission Pricing Methodology (“TPM”), as set out in …
KPMG WUNIVM1b assurance report.pdf
(PDF 118.21 KB)
Last updated: 02 Nov 2022
September 2022 Health, Safety & Wellbeing Board Report (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 4.16 3.99 2.86 4.99 Average number of calendar days … Group. 12/05/2022 FHL-WDV-Awhilst trimming pine trees in a transmission corridor, a worker became unattachedduring … - inc, briefing SP groups, focus on audits, importance of planning tasks, review procedures and equip, and sharing …
Last updated: 21 Oct 2022
September 2022 Health, Safety & Wellbeing Board Report.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 4.16 3.99 2.86 4.99 Average number of calendar days … Group. 12/05/2022 FHL-WDV-Awhilst trimming pine trees in a transmission corridor, a worker became unattachedduring … - inc, briefing SP groups, focus on audits, importance of planning tasks, review procedures and equip, and sharing …
Last updated: 31 Aug 2023
TPM WUNIVM1b OTASTATCOM starting allocations - KPMG assurance report.pdf
… All rights reserved. Independent Reasonable Assurance Report to the General Counsel and Company Secretary of … of the Electricity Industry Participation Code Amendment (Transmission Pricing Methodology Amendments) 2023. … Book”) dated 16 March 2023 and the requirements of the Transmission Pricing Methodology (“TPM”), as set out in …
Last updated: 08 May 2023
2023 SOSA - Draft Report - Consultation Version.pdf
… Energy Margin (NZ-WEM); adequacy of generation and HVDC transmission capacity to meet expected national electricity … a minor increase in the demand forecast compared to that reported in the 2022 SOSA, largely due to information … margins. https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment …
2023 SOSA - Draft Report - Consultation Version.pdf
(PDF 2.72 MB)
Last updated: 28 Feb 2023
Transpower interim report FY23
… Interim Report 2022/23 D .17 FINANCIAL STATEMENTS Six months ended … results for the six months to December 2022 were steady. Transmission revenue increased by 1.0% to $447.8 million … 31 December 2022 Group ($M) 2022 Unaudited 2021 Unaudited Transmission revenue HVAC interconnection 307.0 302.4 HVAC …
Transpower_Interim Report 22-23.pdf
(PDF 505.4 KB)
Last updated: 09 May 2025
Simply Energy - Procurement Plan 2025 - Submission
… We would expect that any load that has signed up to a non-transmission solution (NTS), or EDB Demand Response … Independent Resources that operate and are assessed and reported independently from each other. When bidding via …
Simply Energy - Procurement Plan 2025 - Submission.pdf
(PDF 262.46 KB)
Last updated: 02 Aug 2019
TP Process Heat Report FINAL - 16July'19.pdf
… 09 Section three: The challenge for transmission and distribution companies … This paper is part of an ongoing suite of analysis and reports that collectively make up the Te Mauri Hiko work … transmission assets and other infrastructure. The network planning challenge exists at both the distribution and …
TP Process Heat Report FINAL - 16July'19.pdf
(PDF 7.29 MB)