Resources
Displaying 241 - 250 of 1408
Last updated: 21 Oct 2022
September 2022 Health, Safety & Wellbeing Board Report.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 4.16 3.99 2.86 4.99 Average number of calendar days … Group. 12/05/2022 FHL-WDV-Awhilst trimming pine trees in a transmission corridor, a worker became unattachedduring … - inc, briefing SP groups, focus on audits, importance of planning tasks, review procedures and equip, and sharing …
Last updated: 31 Aug 2023
TPM WUNIVM1b OTASTATCOM starting allocations - KPMG assurance report.pdf
… All rights reserved. Independent Reasonable Assurance Report to the General Counsel and Company Secretary of … of the Electricity Industry Participation Code Amendment (Transmission Pricing Methodology Amendments) 2023. … Book”) dated 16 March 2023 and the requirements of the Transmission Pricing Methodology (“TPM”), as set out in …
Last updated: 08 May 2023
2023 SOSA - Draft Report - Consultation Version.pdf
… Energy Margin (NZ-WEM); adequacy of generation and HVDC transmission capacity to meet expected national electricity … a minor increase in the demand forecast compared to that reported in the 2022 SOSA, largely due to information … margins. https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment …
Last updated: 28 Feb 2023
Transpower interim report FY23
… Interim Report 2022/23 D .17 FINANCIAL STATEMENTS Six months ended … results for the six months to December 2022 were steady. Transmission revenue increased by 1.0% to $447.8 million … 31 December 2022 Group ($M) 2022 Unaudited 2021 Unaudited Transmission revenue HVAC interconnection 307.0 302.4 HVAC …
Last updated: 02 Aug 2019
TP Process Heat Report FINAL - 16July'19.pdf
… 09 Section three: The challenge for transmission and distribution companies … This paper is part of an ongoing suite of analysis and reports that collectively make up the Te Mauri Hiko work … transmission assets and other infrastructure. The network planning challenge exists at both the distribution and …
Last updated: 30 Jul 2019
TP Process Heat Report FINAL - 16July'19.pdf
… 09 Section three: The challenge for transmission and distribution companies … This paper is part of an ongoing suite of analysis and reports that collectively make up the Te Mauri Hiko work … transmission assets and other infrastructure. The network planning challenge exists at both the distribution and …
Last updated: 29 Jul 2019
TP Process Heat Report FINAL - 16July'19.pdf
… 09 Section three: The challenge for transmission and distribution companies … This paper is part of an ongoing suite of analysis and reports that collectively make up the Te Mauri Hiko work … transmission assets and other infrastructure. The network planning challenge exists at both the distribution and …
Last updated: 29 Aug 2025
FY25 Greenhouse Gas Inventory Report
… voice Greenhouse Gas Emissions Inventory Report Transpower New Zealand Limited Version: Final … buildings 133 92 77 Electricity use total 383 279 249 Transmission losses Transmission losses* 153,775 135,928 88,158 Scope 2 total … FY25 Greenhouse Gas Inventory Report …
Last updated: 29 Aug 2025
FY25 GHG Inventory Report FINAL
… voice Greenhouse Gas Emissions Inventory Report Transpower New Zealand Limited Version: Final … buildings 133 92 77 Electricity use total 383 279 249 Transmission losses Transmission losses* 153,775 135,928 88,158 Scope 2 total … FY25 GHG Inventory Report FINAL …
Last updated: 27 Feb 2026
Transpower interim report - to 31 December 2025 1
… D. 17 2025/26 Interim Transpower Interim Report 2025/2026 1 FINANCIAL STATEMENTS Six months ended 31 … $553 million (2024: $476 million) primarily due to higher transmission revenue as a result of the higher Weighted … 31 December 2025 Group ($m) 2025 Unaudited 2024 Unaudited Transmission revenue Interconnection 390 371 Connection 76 …