Resources
Displaying 251 - 260 of 1234
Last updated: 01 Oct 2021
10.09.21 FINAL Transpower GHG Emissions Inventory Report FY2020.21.pdf
… Greenhouse Gas Emissions Inventory Report Transpower NZ Ltd Version: FINAL Inventory Period: 1 … 2) Electricity use in buildings and substations 808 Transmission losses 203,891 Subtotal: 204,699 Indirect … we need to take to give effect to this transition. In our planning, investment and operational functions, we work with …
Last updated: 29 Mar 2021
WiTMH Monitoring Report - March 2021.pdf
… EMPOWERING OUR ENERGY FUTURE DRAFT IN PROGRESS 1 Monitoring Report March 2021 WHAKAMANA I TE MAURI HIKO EMPOWERING OUR … Hiko series, visit https://www.transpower.co.nz/about- us/transmission-tomorrow The base case: Accelerated … advice likely to have an effect 2 Integrated system planning • Transpower has begun its ‘Net Zero Grid Pathways’ …
WiTMH Monitoring Report - March 2021.pdf
(PDF 1.59 MB)
Last updated: 29 Mar 2021
WiTMH Monitoring Report - March 2021.pdf
… EMPOWERING OUR ENERGY FUTURE DRAFT IN PROGRESS 1 Monitoring Report March 2021 WHAKAMANA I TE MAURI HIKO EMPOWERING OUR … Hiko series, visit https://www.transpower.co.nz/about- us/transmission-tomorrow The base case: Accelerated … advice likely to have an effect 2 Integrated system planning • Transpower has begun its ‘Net Zero Grid Pathways’ …
WiTMH Monitoring Report - March 2021.pdf
(PDF 1.59 MB)
Last updated: 17 Jun 2024
Health, Safety & Wellbeing Board Report May 2024.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report Monitor FY 23/24 Monitor FY 23/24 0 Actions Raised 5 … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located … Safety and Wellbeing | Assurance Transpower Systems Audits: Planning is underway for the implementation of the 2024- …
Health, Safety & Wellbeing Board Report May 2024.pdf
(PDF 3.5 MB)
Last updated: 02 Aug 2021
Procurement Plan 2022 -Clean.pdf
… 8.43(f) of the Code) ................... 14 System operator reporting to the Authority (clause 8.43(g) of the Code) … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch … generation output that supports the initial charging of transmission circuits and assets, and the progressive …
Procurement Plan 2022 -Clean.pdf
(PDF 571.94 KB)
Last updated: 09 Aug 2016
TP_TPM_Appendix_C_Axiom_Report_TPM_2nd_Issues_Proposal_Paper_26July2016.pdf
… Economic Review of Second Transmission Pricing Methodology Issues Paper A Report for Transpower July 2016 Project Team Hayden Green, … could also complicate and disrupt Transpower’s investment planning processes. In summary, even if customers could …
Last updated: 04 Oct 2021
10.09.21 FINAL Transpower GHG Emissions Inventory Report FY2020.21 V3.pdf
… Greenhouse Gas Emissions Inventory Report Transpower NZ Ltd Version: FINAL Inventory Period: 1 … 2) Electricity use in buildings and substations 808 Transmission losses 203,891 Subtotal: 204,699 Indirect … we need to take to give effect to this transition. In our planning, investment and operational functions, we work with …
Last updated: 01 Oct 2021
10.09.21 FINAL Transpower GHG Emissions Inventory Report FY2020.21 (002).pdf
… Greenhouse Gas Emissions Inventory Report Transpower NZ Ltd Version: FINAL Inventory Period: 1 … 2) Electricity use in buildings and substations 808 Transmission losses 203,891 Subtotal: 204,699 Indirect … we need to take to give effect to this transition. In our planning, investment and operational functions, we work with …
Last updated: 14 Apr 2020
Temporary ISL-LIV Transfer Limits Report.pdf
… Temporary ISL-LIV Transfer Limits Report Operations Transpower New Zealand Limited January … Position Date Prepared By: Nicholas Merrington Operations Planning Engineer January 2020 Reviewed By: Angela Houston … event on the 8th of December 2019 led to the loss of nine transmission towers along the Islington-Livingstone circuit. …
Temporary ISL-LIV Transfer Limits Report.pdf
(PDF 768.91 KB)
Last updated: 23 Jul 2024
Health, Safety & Wellbeing Board Report June 2024.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report Monitor FY 23/24 Monitor FY 23/24 1 2 Machinery, … There was one high potential incident reported in June. A transmission tower on the Henderson – Marsden line fell … Operations, Unfit for Work & Working Alone are scheduled. Planning for the TP Systems Audits is complete. Audit …
Health, Safety & Wellbeing Board Report June 2024.pdf
(PDF 3.69 MB)