Resources
Displaying 271 - 280 of 1234
Last updated: 09 Jul 2018
Report%20on%202%20March%202017%20South%20Island%20AUFLS%20Event.pdf
… Report on 2 March 2017 South Island AUFLS Event July 2018 … the incident was the disconnection of two in-service 220 kV transmission circuits during scheduled equipment tests at … of this investigation was on issues relating to outage planning, the event trigger and incorrect actions …
Last updated: 15 Dec 2020
Trustpower submission on TPM Options Consultation - Attachment 1 - CEC 2020 Report - BBC and RC.pdf
… rationale as to why it believes that fixed, benefit-based transmission charges will best achieve its statutory … constructive participation by customers in transmission planning processes and to enhance the perceived fairness, … pricing design that are always relevant and important. This report presents the views of myself and my company, CEC, and …
Last updated: 16 May 2018
Attachment D Outage modelling report.pdf
… PARK SECTION) RECONDUCTORING ATTACHMENT D: OUTAGE MODELLING REPORT Transpower New Zealand Limited February 2018 OTERANGA … be higher transfers from South Island generation. However, transmission constraints in the lower South Island would … looked at bringing the project timing forward. However, the planning, procurement and 3 …
Attachment D Outage modelling report.pdf
(PDF 948.27 KB)
Last updated: 27 Nov 2013
CEG Report - Economic Review of EA CBA Working Paper _October 2013.pdf
… Economic Review of EA CBA Working Paper A REPORT FOR TRANSPOWER October 2013 Project Team: Hayden … 5 2 Economic Efficiency and Pricing 6 2.1 The objective of transmission pricing 6 2.2 SRMC and static efficiency 7 2.3 … it could lead to significant changes in the transmission planning outlook. The forecast requirement for (now) …
Last updated: 06 Apr 2017
Winter 2017 capacity margin report.pdf
… Winter Group (NWG) analysis format (2007-2016)3. This report contains the results of the NZGB based assessment of … - (A + C) 757 948 E Available HVDC transfer capacity Before transmission loss 1200 1200 F Estimated energy transfer … North Island N-1 and N-G-1 capacity margins. Plant/Circuit Planning Status Start End MW Loss HLY9 Confirmed 1/07/2015 …
Winter 2017 capacity margin report.pdf
(PDF 835.98 KB)
Last updated: 05 Jul 2023
PR-OC-214 Publish a Planned Outage Co-ordination Procedure (POCP) Assessment.pdf
… 10 5.4.2 HVDC outages – Planning … been approved for publishing? Publish the assessment report to POCP 3 Yes Continue to monitor the situation after … effect of this constraint is to manage flows through all transmission lines into the upper North Island region for a …
Last updated: 22 May 2023
System operator initial report Hawkes Bay loss of supply.pdf
… System operator initial report: Hawke’s Bay loss of supply This document outlines … conditions 3.1 Hawke’s Bay power system The Hawke’s Bay transmission system (known as grid zone 5) is depicted in … slip has exposed a section of the Firstgas Bay of Plenty transmission pipeline near Gisborne. Note: Gas supply to …
Last updated: 03 Dec 2019
Draft Procurement Plan 2018 - For Consultation.pdf
… .............................. 141414 System operator reporting to the Authority (clause 8.43(g)) … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch … generation output that supports the initial charging of transmission circuits and assets, and the progressive …
Draft Procurement Plan 2018 - For Consultation.pdf
(PDF 583.05 KB)
Last updated: 03 Jul 2024
2024 SOSA - Final Report - Final Version.pdf
… Margin (SI-WEM); adequacy of generation and north- to-south transmission capacity to meet expected South Island … decrease in the national demand forecast compared to that reported in the 2023 SOSA, largely attributed to a lower … MW for NI-WCM. https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment …
2024 SOSA - Final Report - Final Version.pdf
(PDF 3.91 MB)
Last updated: 10 Sep 2014
TP_Sub_Appendix_A_Frontier_Loss_Function_Report_29_Aug14.pdf
… of a loss function simulation model to New Zealand A REPORT PREPARED FOR TRANSPOWER August 2014 i Frontier … that the resulting WACC percentile would apply to both transmission and distribution networks, which leads to a … input assumptions peak demand forecast in its 2014 Annual Planning Report 32 as a proxy and assumed that new demand …
TP_Sub_Appendix_A_Frontier_Loss_Function_Report_29_Aug14.pdf
(PDF 835.66 KB)