Resources
Displaying 311 - 320 of 1385
Last updated: 15 Apr 2024
Health Safety and Wellbeing Board Report March 2024.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 3 Actions Closed 1 Actions Raised Monitor FY 23/24 … Wednesday, 31 July 2024 APPR New action raised to assess transmission standard steel pole ‘winching lug’ viability … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located …
Last updated: 11 Nov 2025
Market Operations - Weekly Report - 9 November 2025
… Power BI Desktop Market Operations Weekly Report - Week Ended 9 November 2025 TRANSPOWER // MARKET … during tight supply-demand conditions. From an outage planning perspective, having slow-start thermal generation … and tighter system conditions, particularly when planned transmission and generation outages increase grid …
Last updated: 15 Dec 2020
Trustpower submission on TPM Options Consultation - Attachment 2 - JC 2020 Report - Example_UpperWaitaki_FINAL.pdf
… this worked example 8 Dec 2020 John Culy JC2JC2Introduction Report to TrustPower - 8 December 2020 2 o TrustPower … for the current Clutha Upper Waitaki Lines Project. o This transmission project is relatively simple and straight … schemes that is likely with Tiwai exit and without the transmission investment. The major uncertainty relates to …
Last updated: 13 Sep 2024
Health Safety Wellbeing Board Report August 2024.pdf
… Corrective Actions Status Workplan Delivery Assurance l Reporting l <6 Target Controls Checked 755 Worksafe … activities were pivoted and focused on People (competency), Planning for the work (including procedures) and Supervision … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located …
Last updated: 02 Aug 2021
Procurement Plan 2022 - Marked Up.pdf
… 8.43(f) of the Code) ................... 14 System operator reporting to the Authority (clause 8.43(g) of the Code) … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch … generation output that supports the initial charging of transmission circuits and assets, and the progressive …
Last updated: 19 Oct 2023
Health Safety & Wellbeing Board Report September 2023.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 2.46 176 0 Actions Raised 0 Actions Closed 22973 … TP.HSW 01.13b Health, safety and wellbeing performance report September 2023 Oct 2022 Nov 2022 Dec 2022 Jan 2023 … site specific run engineering specification. Following the ‘transmission lines best practice guide’, no one was located …
Last updated: 27 Feb 2017
TP_TPM_Supplementary_Appendix_B_Axiom_Report_24Feb2017.pdf
… Economic Review of Transmission Pricing Supplementary Consultation Paper A Report for Transpower February 2017 Project Team Hayden … building in the near-term, e.g., to find a site, obtain planning approvals, arrange financing, undertake … TP_TPM_Supplementary_Appendix_B_Axiom_Report_24Feb2017.pdf …
Last updated: 04 Nov 2022
2022 SOSA - Final Report - (Revised) Final Version.pdf
… to 2024. It is now consistent with the remainder of the report. IMPORTANT Disclaimer The information in this … 45 4.2.6 Inter-Island Transmission Assumptions … demand forecast aligned with transmission and strategic planning (e.g. Whakamana i Te Mauri Hiko), the Electricity …
Last updated: 04 Nov 2022
2022 SOSA - Final Report - (Revised) Final Version.pdf
… to 2024. It is now consistent with the remainder of the report. IMPORTANT Disclaimer The information in this … 45 4.2.6 Inter-Island Transmission Assumptions … demand forecast aligned with transmission and strategic planning (e.g. Whakamana i Te Mauri Hiko), the Electricity …
Last updated: 10 Jun 2025
FINAL Ancillary Services Procurement Plan Review Proposal
… services contracts by technical staff due to additional reporting and testing requirements (particularly to meet the … We would expect that any load that has signed up to a non- transmission solution (NTS), or EDB Demand Response … We would expect that any load that has signed up to a non-transmission solution (NTS), or Demand response programme, …