Resources
Displaying 331 - 340 of 1352
Last updated: 30 Nov 2023
Interconnection asset capacity and grid configuration Annual Report 2022-23.pdf
… asset capacity and grid configuration Annual Report 2022 - 2023 Pursuant to Electricity Industry … agreed to prioritise the harvest of trees within 40m of the Transmission line. Wet weather has prevented the harvest. … and interested participant understanding of our Outage Planning processes and to improve transparency of Transpower …
Last updated: 25 Nov 2025
s53ZD_Cost_Estimation_24November2025
… 1. The information sought under the s53ZD notice1 via this report is to assist the Commission to: • investigate and … Energy Agency has published “Building the Future Transmission Grid”9, a report that examines investment in … for FY26 FEC = $20.4m -$6.8m 24% 15 2022 Transmission Planning Report.pdf page 64 16 2022 Transmission Planning …
Last updated: 02 Dec 2022
s53ZD_Customer_Consultation_25November2022.pdf
… 16 Schedule A6 Post-interruption survey report … Customers are satisfied with the way Transpower engages on planning and delivery. This view is supported by our … proposal and the “within period” publications through our Transmission Planning Report and Asset Management Plan. 3 …
Last updated: 09 Jul 2019
Distributed BESS in NZ - Power System Operational Implications - Technical Report.pdf
… in NZ - Power System Operational Implications - Technical Report © Transpower New Zealand Limited 2019. All rights … winter evening peak demand. This would require added transmission and peaking generation capacity, which we can … Contingency The uncertainty of an event occurring, and the planning to cover for it; for example, in relation to …
Last updated: 06 Jul 2017
Chapter 6 - Grid Backbone 2017 - FINAL.pdf
… Chapter 6: Grid Backbone 2017 Transmission Planning Report © Transpower New Zealand Limited 2017. All rights …
Last updated: 06 Jul 2017
Chapter 6 - Grid Backbone 2017 - FINAL.pdf
… Chapter 6: Grid Backbone 2017 Transmission Planning Report © Transpower New Zealand Limited 2017. All rights …
Last updated: 29 Sep 2025
FINAL 2025 ITP Glossary
… TRANSPOWER NEW ZEALAND | 2025 ITP Glossary 2025 Integrated Transmission Plan Glossary September 2025 TRANSPOWER NEW … Time Communications AP5 Asset Performance 5 - N-Security Reporting Asset health and asset health index (AHI) Asset … Integrated Transmission Plan (consists of the Transmission Planning Report, Asset Management Plan and Grid Outputs …
Last updated: 02 Jun 2023
Transpower Disposal Schedule for consultation (2023)
… (after record is non-current) Disposal action Notes 1.1 Planning and Strategy - Significant Information and records … documenting the strategic planning or development of Transmission assets. Example information and records are: • … Example information and records include: • compliance reports • investigation into rule breaches • correspondence …
Last updated: 17 Apr 2025
Ancillary Services Procurement Plan 2025_tracked changes
… services (clause 8.43(f) of the Code) 15 System operator reporting to the Authority (clause 8.43(g) of the Code) 16 … and dispatching ancillary services to assist it in planning to comply and complying with its dispatch objective … generation output that supports the initial charging of transmission circuits and assets;, and the progressive …
Last updated: 05 Dec 2022
NZGP1 MCP ATTACHMENT A - COMPLIANCE REQUIREMENTS.pdf
… IM. It is one of the supporting attachments for our main report (‘Net Zero Grid Pathways Stage 1 Major Capex … starting BBI customer allocations Attachment G – Indicative transmission charges Attachment H – Summary of Submissions … major capex project- (a) a consultation programme for a transmission investment or non-transmission solution, in …