Resources
Displaying 371 - 380 of 1408
Last updated: 21 Jul 2017
SCI 2017 18.pdf
… Deliver and operate a safe, reliable, cost efficient transmission grid that meets New Zealand’s needs now and … service targets that we describe in full in our Services Report6. These encompass: �� Grid interruptions – targets … on financial returns, we have shifted to an approach of planning for a consistent dividend level across a regulatory …
Last updated: 21 Jul 2017
SCI 2017 18.pdf
… Deliver and operate a safe, reliable, cost efficient transmission grid that meets New Zealand’s needs now and … service targets that we describe in full in our Services Report6. These encompass: �� Grid interruptions – targets … on financial returns, we have shifted to an approach of planning for a consistent dividend level across a regulatory …
Last updated: 02 Dec 2022
s53ZD_Cost_Estimation_25November2022.pdf
… 1. The information sought under the s53ZD notice1 via this report is assist the Commission to: • investigate and assess … and to supply the reactive consumption of heavily loaded transmission circuits from the Taranaki region. For this … 30% between proposal cost indicated in the Transmission Planning Report (TPR) 2018 and the delivery business case …
Last updated: 04 Jul 2017
Chapter 5 - Major Electricity Industry Events Chapter 2017 - FINAL.pdf
… Chapter 5: Major Industry Events 2017 Transmission Planning Report © Transpower New Zealand Limited 2017. All rights …
Last updated: 02 Nov 2022
January 2021 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 2 3 1 1 / Health, Safety & Wellbeing | Health & … safety intiatives completed. Target 2 Actual 2 On Track: l Planning of the 2021 STAR Awards is progressing well. … to discuss aviation operators working in close proximity to Transmission lines. The CAA have committed to work with …
Last updated: 02 Nov 2022
January 2021.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 2 3 1 1 / Health, Safety & Wellbeing | Health & … safety intiatives completed. Target 2 Actual 2 On Track: l Planning of the 2021 STAR Awards is progressing well. … to discuss aviation operators working in close proximity to Transmission lines. The CAA have committed to work with …
Last updated: 02 Nov 2022
November 2020 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 12/17/2020 H&S Performance 1/1 Health, Safety & … safety intiatives completed. Target 2 Actual 2 On Track: l Planning of the 2021 STAR Awards is progressing well with 66 … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to …
Last updated: 29 Sep 2020
ITP Narrative 2020.pdf
… 2020 Integrated Transmission Plan Narrative Transpower New Zealand Ltd … near-term uncertainty to assumptions presented in this report. We are still understanding the long-term effects … ICT and business support assets. • The 2020 Transmission Planning Report identifies and describes the grid security …
Last updated: 29 Sep 2025
FINAL 2025 ITP Narrative
… TRANSPOWER NEW ZEALAND|2025 Integrated Transmission Plan Narrative 1 2025 Integrated Transmission … documents: the Asset Management Plan (AMP), Transmission Planning Report (TPR), and Service Measures Report (SMR). Together …
Last updated: 12 Jan 2026
20251127 2024 - 2025 Transpower Interconnection Asset Capacity and Grid Configuration Report
… 2025 Interconnection Asset Capacity and Grid Configuration Report ................... 3 1.1 Background … and interested participant understanding of our Outage Planning processes and to improve transparency of Transpower … discussed the proposed outage plan with each designated transmission customer and interested participant on an …