Resources
Displaying 401 - 410 of 1295
Last updated: 24 May 2017
20170427_ServiceEngagement2Submission.pdf
… kV grid and/or interconnected grid, enjoy a high level of transmission security via multiple circuits and bus … undertake efficiency and optimisation of outages within the planning horizon? Whilst we welcome improved communication … this new asset performance measure and would welcome reports being made available on Transpower’s website to …
Last updated: 21 Oct 2019
TPR0003 Annual Review 2018-19 v11 Interactive 6.pdf
… 2018/19Annual Review CONTENTS Our Year In Review 01 Chair’s Report 02 Chief Executive’s Report 04 Year at a Glance 07 … transition to becoming a net zero-carbon economy. Careful planning, coordination and a commitment to innovation is key … of $1,084.4 million. This was primarily driven by lower transmission revenue which dropped around five per cent from …
Last updated: 13 Dec 2019
WUNIVM MCP - Attachment A - Compliance requirements.pdf
… IM. It is one of the supporting attachments for our main report (‘Waikato and Upper North Island Voltage Management … capex threshold ($20m) and potential expenditure on non-transmission solutions; and • will not be incurred in … with clause 8.1.3- i) a consultation programme for a transmission investment or non-transmission solution; and …
Last updated: 04 Jul 2017
Appendix C - Glossary 2017 - FINAL.pdf
… Appendix C: Glossary 2017 Annual Planning Report © Transpower New Zealand Limited 2017. All rights … same bus. cable One or more insulated conductors forming a transmission circuit above or below ground. capacitor bank A …
Last updated: 30 Jun 2025
Transpower 2025 26 SCI Final
… 9 2.11 Transmission Services … • Deliver and operate a safe, reliable, cost-efficient transmission grid that meets New Zealand’s needs now and … (typically an AHI of eight or higher). We measure and report the AHI for seven key asset classes5 for the RCP4 … previous two years is achieved. In FY26, this measure is reporting only, while the RCP4 asset health quality standard …
Last updated: 27 Nov 2019
CAP Newsletter August 2019.pdf
… panel’s advice and insights to better inform its business planning and decision making. We believe that through … Change Commission’s (ICCC) Accelerated Electrification report and Transpower’s own Process Heat report. The ICCC … following feedback and a review of the work programme. 4. Transmission pricing and Transmission Pricing Review: …
Last updated: 28 Jan 2019
Transpower cross submission to Commerce Commission RCP3 process.pdf
… process comprised: • tripartite meetings; • draft and final reports shared with the Commission and Transpower; and • a … Clarifying the impact of transmission on residential electricity prices Any … this proposal (and in more detail in our 2018 Transmission Planning Report), will not be materially affected by Te …
Last updated: 28 Aug 2023
Notice of Intention - Upper South Island Apr5 2023.pdf
… on our latest demand forecasts (as outlined in the 2022 Transmission Planning Report),1 we have identified that the supply into the USI …
Last updated: 14 Aug 2024
August 2024 customer webinar slides.pdf
… Release Boundary here • Access security of supply daily reporting on Transpower website here • To join our System … enquiries to connect to Transpower is strong Investment in transmission is required to meet this growth, while … increased from 50-60% to 70-80% o System / network planning o Managing unplanned outages o Completion of …
Last updated: 29 Mar 2021
FINAL - DOMESTIC BOND Investor Presentation.pdf
… throughout different levels of lockdown with extensive re-planning of the project portfolio and related outages • … Impact of COVID-19 Pandemic 9 • Over $4.8 billion regulated transmission assets • Sole Transmission System Operator … Statements June 2020 and Transpower’s Transmission Planning Report 2020 …