2025 SOSA - Draft Appendices
… 20 A3.5 Inter-Island Transmission Assumptions … 34 Appendix 6: Security of Supply Reporting 36 TRANSPOWER NEW ZEALAND | APPENDICES FOR DRAFT … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
2025 SOSA - Draft Appendices.pdf
(PDF 2.01 MB)
Last updated: 14 May 2024
Waikato Regional MCP - Attachment 1 - Overview of need.pdf
… 2.2 Relationship with the Transmission Pricing Methodology … LONG-LIST CONSULTATION 5 1.2.1 Security standards Our planning studies that support our Transmission Planning Report2 (TPR) regularly review the needs of the national …
Waikato Regional MCP - Attachment 1 - Overview of need.pdf
(PDF 543.16 KB)
Last updated: 10 May 2021
GOR 2020.pdf
… 2020 Grid Outputs Report Transpower New Zealand Ltd Contents 1. INTRODUCTION … 14 Linking Grid Outputs to Planning … with: • a summary of the performance of our regulated transmission business during Disclosure Year 20201 (July … This includes our provision of regulated electricity transmission services as well as provision of the system …
GOR 2020.pdf
(PDF 1.27 MB)
Last updated: 29 Sep 2020
GOR 2020.pdf
… 2020 Grid Outputs Report Transpower New Zealand Ltd Contents 1. INTRODUCTION … 14 Linking Grid Outputs to Planning … with: • a summary of the performance of our regulated transmission business during Disclosure Year 20201 (July … This includes our provision of regulated electricity transmission services as well as provision of the system …
GOR 2020.pdf
(PDF 1.27 MB)
Last updated: 02 Nov 2022
February 2021 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
February 2021 (1).pdf
(PDF 825.92 KB)
Last updated: 02 Nov 2022
February 2021.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
February 2021.pdf
(PDF 825.92 KB)
Last updated: 27 Nov 2013
TP_Sub_Appropriations_14_15.pdf
… programme (which we acknowledge has been informed by joint planning with the SO). We note, however, that in some cases … expected to unlock. Transpower’s 2012/13 annual regulatory report1 (ARR) to the Commerce Commission, which was … .comcom.govt.nz/regulated-industries/electricity/electricity-transmission/transpower- information-disclosure/ …
TP_Sub_Appropriations_14_15.pdf
(PDF 137.59 KB)
Last updated: 22 Jun 2020
BOB-OTA Major Capex Proposal.pdf
… 31 5.2 RFP for Non-Transmission Solutions … Bombay- Otahuhu A 110kV transmission line2. When: We are planning to fully commission these works by 30 June 2023. … tps://www.transpower.co.nz/resources/auckland-strategy-final-report Executive summary BOMBAY OTAHUHU REGIONAL MAJOR CAPEX …
BOB-OTA Major Capex Proposal.pdf
(PDF 921.4 KB)
Last updated: 06 Oct 2023
20211116 RM (Enabling Housing Supply and Other Matters) Amendment Bill - Final Submission.pdf
… is the owner and operator of New Zealand’s electricity transmission network, the National Grid. It welcomes the … lines, recognition and protection of the National Grid in planning instruments was inconsistent, and in many instances … must provide evidence to support this in its evaluation report, as required under section 32 of the Resource …
Last updated: 16 Apr 2020
SO Annual Review 2018-19.pdf
… processes, in this regard. These include additional advance reporting on likely generation balance margins during major … and no perception of such a lack. The revised Outage Planning Policy we issued mid-year sought to further clarify … pole 3 transfer maximum limit. The grid owner’s day-time transmission asset capability offers are based on an assumed …
SO Annual Review 2018-19.pdf