Resources
Displaying 411 - 420 of 1259
Last updated: 08 Jun 2012
compliance-statement-30-jun-2007.pdf
… SERVICES 34 SCHEDULE 6 36 STANDARD SPECIFICATIONS: REPORTING BY CONTRACTORS 36 SCHEDULE 7 38 STANDARD … are not directly related to the provision of electricity transmission; and c. demonstrates that it has not complied … to consumers are those set out in Transpower’s: a. Annual Planning Report; b. Asset Management Plan; c. connections …
Last updated: 21 Jan 2025
Market Operations - Weekly Report - 19 January 2025
… Power BI Desktop Market Operations Weekly Report - Week Ended 19 January 2025 TRANSPOWER // MARKET … more closely through the market schedules. The latest NZGB report is available on the NZGB website. Electricity Market … hydro storage, reduced wind, and some central North Island transmission outages. Hydro generation contributed 61%, wind …
Last updated: 20 Dec 2024
WBoP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; … of the investment need with our latest Transmission Planning Report (2023). The Transmission Planning Report is part of …
Last updated: 04 Jul 2017
Chapter 3 - Investment Uncertainties 2017 - FINAL.pdf
… Chapter 3: Investment Uncertainties 2017 Transmission Planning Report © Transpower New Zealand Limited 2017. All rights …
Last updated: 08 Jun 2012
third-threshold-compliance-statement-aug-05.pdf
… SERVICES SCHEDULE 6 30 STANDARD SPECIFICATIONS: REPORTING BY CONTRACTORS SCHEDULE 7 32 STANDARD … are not directly related to the provision of electricity transmission; and c. demonstrates that it has complied with … these service quality demands in its asset management planning. 27. For the purposes of compliance with the 2003 …
Last updated: 14 Dec 2017
TP_Sub_Capex_IM_Draft_Decisions_12Dec2017.pdf
… comparison’ to CC 24 November 2107 6 Via grid reliability report 12.114 and GRS, and grid economic investment report … for our RCP3 proposal as described in our July 2017 Transmission Planning Report. 11 In Appendix A we evaluate the Commission …
Last updated: 03 Mar 2025
TP_WACC_Attach_C_Castalia_Rational Regulated Response
… Advisory Group. The Rational Response of a Regulated Transmission Company to a Low WACC Report to Transpower 1 May 2014 Confidential Acronyms and … GRS to its network. The GRS rely on forecasts that reflect planning, judgement and attitudes towards risk. Changing …
Last updated: 14 May 2024
Waikato Regional MCP - Attachment 1 - Overview of need.pdf
… 2.2 Relationship with the Transmission Pricing Methodology … LONG-LIST CONSULTATION 5 1.2.1 Security standards Our planning studies that support our Transmission Planning Report2 (TPR) regularly review the needs of the national …
Last updated: 09 May 2025
2025 SOSA - Draft Appendices
… 20 A3.5 Inter-Island Transmission Assumptions … 34 Appendix 6: Security of Supply Reporting 36 TRANSPOWER NEW ZEALAND | APPENDICES FOR DRAFT … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 22 Jun 2020
BOB-OTA Major Capex Proposal.pdf
… 31 5.2 RFP for Non-Transmission Solutions … Bombay- Otahuhu A 110kV transmission line2. When: We are planning to fully commission these works by 30 June 2023. … tps://www.transpower.co.nz/resources/auckland-strategy-final-report Executive summary BOMBAY OTAHUHU REGIONAL MAJOR CAPEX …