Resources
Displaying 461 - 470 of 1408
Last updated: 09 May 2025
2025 SOSA - Draft Appendices
… 20 A3.5 Inter-Island Transmission Assumptions … 34 Appendix 6: Security of Supply Reporting 36 TRANSPOWER NEW ZEALAND | APPENDICES FOR DRAFT … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 10 May 2021
GOR 2020.pdf
… 2020 Grid Outputs Report Transpower New Zealand Ltd Contents 1. INTRODUCTION … 14 Linking Grid Outputs to Planning … with: • a summary of the performance of our regulated transmission business during Disclosure Year 20201 (July … This includes our provision of regulated electricity transmission services as well as provision of the system …
Last updated: 29 Sep 2020
GOR 2020.pdf
… 2020 Grid Outputs Report Transpower New Zealand Ltd Contents 1. INTRODUCTION … 14 Linking Grid Outputs to Planning … with: • a summary of the performance of our regulated transmission business during Disclosure Year 20201 (July … This includes our provision of regulated electricity transmission services as well as provision of the system …
Last updated: 27 Nov 2013
TP_Sub_Appropriations_14_15.pdf
… programme (which we acknowledge has been informed by joint planning with the SO). We note, however, that in some cases … expected to unlock. Transpower’s 2012/13 annual regulatory report1 (ARR) to the Commerce Commission, which was … .comcom.govt.nz/regulated-industries/electricity/electricity-transmission/transpower- information-disclosure/ …
Last updated: 15 Jan 2026
WUNI2 - Attachment 1 - Need
… our assumptions regarding the physical constraints of the transmission system as well as demand and generation in the … (potential Stages 2 and 3) were identified during Stage 1 planning as necessary to support ongoing regional demand … Our planning studies that support our Transmission Planning Report5 (TPR) regularly assess the needs of the national …
Last updated: 07 Jul 2025
GL-EA-953 Connection Study Requirements for Connecting a New Generating Station.pdf
… 9 3.2. Connection Studies Report … to normal commercial operation. Feasibility Initiation Planning Delivery Commissioning Closeout GL-EA-716 Power … if your generating asset is connected directly to the grid transmission network. We have summarised these obligations …
Last updated: 21 Jan 2025
Market Operations - Weekly Report - 19 January 2025
… Power BI Desktop Market Operations Weekly Report - Week Ended 19 January 2025 TRANSPOWER // MARKET … more closely through the market schedules. The latest NZGB report is available on the NZGB website. Electricity Market … hydro storage, reduced wind, and some central North Island transmission outages. Hydro generation contributed 61%, wind …
Last updated: 20 Aug 2025
USI MCP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; major … investment options. • Attachment 10: Power Systems Analysis Report 7.4.1(3) (3) With respect to each investment option … of the investment need with our latest Transmission Planning Report (2023). The Transmission Planning Report is …
Last updated: 02 Nov 2022
February 2021 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
Last updated: 02 Nov 2022
February 2021.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …