Resources
Displaying 461 - 470 of 1385
Last updated: 29 Sep 2020
GOR 2020.pdf
… 2020 Grid Outputs Report Transpower New Zealand Ltd Contents 1. INTRODUCTION … 14 Linking Grid Outputs to Planning … with: • a summary of the performance of our regulated transmission business during Disclosure Year 20201 (July … This includes our provision of regulated electricity transmission services as well as provision of the system …
Last updated: 27 Nov 2013
TP_Sub_Appropriations_14_15.pdf
… programme (which we acknowledge has been informed by joint planning with the SO). We note, however, that in some cases … expected to unlock. Transpower’s 2012/13 annual regulatory report1 (ARR) to the Commerce Commission, which was … .comcom.govt.nz/regulated-industries/electricity/electricity-transmission/transpower- information-disclosure/ …
Last updated: 15 Jan 2026
WUNI2 - Attachment 1 - Need
… our assumptions regarding the physical constraints of the transmission system as well as demand and generation in the … (potential Stages 2 and 3) were identified during Stage 1 planning as necessary to support ongoing regional demand … Our planning studies that support our Transmission Planning Report5 (TPR) regularly assess the needs of the national …
Last updated: 07 Jul 2025
GL-EA-953 Connection Study Requirements for Connecting a New Generating Station.pdf
… 9 3.2. Connection Studies Report … to normal commercial operation. Feasibility Initiation Planning Delivery Commissioning Closeout GL-EA-716 Power … if your generating asset is connected directly to the grid transmission network. We have summarised these obligations …
Last updated: 20 Aug 2025
USI MCP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; major … investment options. • Attachment 10: Power Systems Analysis Report 7.4.1(3) (3) With respect to each investment option … of the investment need with our latest Transmission Planning Report (2023). The Transmission Planning Report is …
Last updated: 02 Nov 2022
February 2021 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
Last updated: 02 Nov 2022
February 2021.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
Last updated: 28 Oct 2021
Atiamuri Series Reactors RC Application FINAL 20211027 with appendices.pdf
… Louise Miles, Transpower Signature Limitations: The report has been prepared for Transpower, according to their … (National Environmental Standards for Electricity Transmission Activities) Regulations … the proposal, it must be considered against the following planning instruments: • Resource Management (National …
Last updated: 12 Aug 2024
Evolving Market Resource Coordination
… data centre growth: Whakamana i Te Mauri Hiko Monitoring Report - October 2023 2 This can be seen in the future … https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment … of ancillary services purchased by the system operator.” 4 Transmission connected generation and embedded generation …
Last updated: 16 Apr 2020
SO Annual Review 2018-19.pdf
… processes, in this regard. These include additional advance reporting on likely generation balance margins during major … and no perception of such a lack. The revised Outage Planning Policy we issued mid-year sought to further clarify … pole 3 transfer maximum limit. The grid owner’s day-time transmission asset capability offers are based on an assumed …