Resources
Displaying 471 - 480 of 1408
Last updated: 28 Oct 2021
Atiamuri Series Reactors RC Application FINAL 20211027 with appendices.pdf
… Louise Miles, Transpower Signature Limitations: The report has been prepared for Transpower, according to their … (National Environmental Standards for Electricity Transmission Activities) Regulations … the proposal, it must be considered against the following planning instruments: • Resource Management (National …
Last updated: 12 Aug 2024
Evolving Market Resource Coordination
… data centre growth: Whakamana i Te Mauri Hiko Monitoring Report - October 2023 2 This can be seen in the future … https://www.transpower.co.nz/system-operator/planning-future/security-supply-annual-assessment … of ancillary services purchased by the system operator.” 4 Transmission connected generation and embedded generation …
Last updated: 16 Apr 2020
SO Annual Review 2018-19.pdf
… processes, in this regard. These include additional advance reporting on likely generation balance margins during major … and no perception of such a lack. The revised Outage Planning Policy we issued mid-year sought to further clarify … pole 3 transfer maximum limit. The grid owner’s day-time transmission asset capability offers are based on an assumed …
Last updated: 03 Dec 2024
SO Industry Forum 3 December 2024
… very low in the North Island What this means for planned transmission outages: • The system operator’s usual generation planning assumptions for thermal generation (i.e 90th … section of our website. Winter 2024 Review: This report reviews the performance of the electricity system and …
Last updated: 30 Jun 2023
Transpower 2023/24 Statement of Corporate Intent
… 9 2.11 Transmission Services … • Deliver and operate a safe, reliable, cost-efficient transmission grid that meets New Zealand’s needs now and … when intervention is likely to be required. We measure and report the AHI for six asset classes. Two classes (power … opportunities. We will also be undertaking climate change reporting to Aotearoa New Zealand Climate Standards …
Last updated: 05 Dec 2022
Net Zero Grid Pathways 1 major capex proposal.pdf
… 35 2.4.5 Transmission outages … 38 3.3 Treatment of non-transmission solutions … these investments as a package enables forward work planning to ensure timely delivery, and allows Transpower to … face. As detailed in the recent The Future is Electric report from Boston Consulting Group: “This will require …
Last updated: 27 Nov 2023
BOB-OTA Regional_Post_Project_Review_CC_28Nov2023.pdf
… of conductor wire along both the Otahuhu-Wiri 110 kV transmission lines south of Auckland. The project also … REVIEW 6 1.1 Requirement for Post-Project Review This report addresses the requirement for a Post-Project Reviews … within the Bombay-Otahuhu region. Transpower’s ongoing planning and maintenance programme identified a range of …
Last updated: 02 Dec 2020
Revised CSMP small scale works 25 November 2020.pdf
… 8 3.1 Substations 8 3.2 Transmission Corridors 8 3.3 … earthworks at substations, offices/warehouses and along the transmission lines. … vicinity of the works area: Any incidents shall be reported to the HSO; … s and Environmental Planners in the Environmental Policy and Planning Group (EPPG) at Transpower 8 …
Last updated: 27 Nov 2020
Revised CSMP small scale works 25 November 2020.pdf
… Contaminated Soil Conditions 8 3.1 Substations 8 3.2 Transmission Corridors 8 3.3 Conceptual Site Model for small … with MfE Contaminated Land Management Guidelines No.1 – Reporting on Contaminated Sites in New Zealand. Sampling … and Environmental Planners in the Environmental Policy and Planning Group (EPPG) at Transpower 7 Tonkin & Taylor Ltd …
Last updated: 30 Jun 2025
2025 SOSA - Final Appendices
… 20 A3.5 Inter-Island Transmission Assumptions … 31 Appendix 6: Security of Supply Reporting 33 Appendix 7: Summary of changes to draft SOSA 34 … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …