Resources
Displaying 531 - 540 of 1234
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… 13 7.2. GP-M – momentary interruptions reporting … used throughout this paper are described in the Integrated Transmission Plan Glossary. Grid Service Measures Engagement … lost load and forecast load based on our 2022 Transmission Planning Report8. In defining the boundaries of ‘High’ and …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)
Last updated: 23 Sep 2022
Grid Service Measures Engagement Paper 2 (Annex).pdf
… 13 7.2. GP-M – momentary interruptions reporting … used throughout this paper are described in the Integrated Transmission Plan Glossary. Grid Service Measures Engagement … lost load and forecast load based on our 2022 Transmission Planning Report8. In defining the boundaries of ‘High’ and …
Grid Service Measures Engagement Paper 2 (Annex).pdf
(PDF 1.84 MB)
Last updated: 11 Jul 2017
TPMsub_OpRev2_ItC_Trustpower_10Jul17.pdf
… Transpower should undertake an operational review of the transmission pricing methodology” (the Consultation Paper). … acquaintance with its own costs.” He also notes in his report that in the case of the regulation of a monopoly … Thus, stability for the purposes of structural financial planning or the design of infrastructures, is long term in …
TPMsub_OpRev2_ItC_Trustpower_10Jul17.pdf
(PDF 1009.35 KB)
Last updated: 21 Feb 2024
TP_Sub_RCP4__IssuesPaper_Feb2024.pdf
… annual quality limits.” Refer to Independent Verification report, Table 20-13 – Evaluation summary of the proposed AP2 … a measure of the price impact of the unavailability of the transmission assets on electricity prices. 31. Regarding … in its deliverability review and is carrying out workforce planning and development initiatives”8 35. The Commission …
TP_Sub_RCP4__IssuesPaper_Feb2024.pdf
(PDF 288.02 KB)
Last updated: 11 Oct 2023
Independent Verifier stakeholder presentation 10 and 11 Oct 2023
… activities, RFI Issue draft independent verification report Issue final independent verification report … (Melbourne) ▪ Service measures ▪ Deliverability, workforce planning ▪ Transmission lines ▪ Grid opex, AMO opex Anuraag Malla …
Last updated: 19 Aug 2022
Major Energy Users Group submission on NZGP1 Stage 1 shortlist.pdf
… 1. Planned outage performance to ensure efficient outage planning is achieved and 2. New grid connections to ensure … of future load forecasts. GP-M – Momentary Interruptions Reporting 10. Do you use the information reported on in the … (c) Given the uncertainties created by the shift to the new Transmission Pricing Methodology we recommend that …
Last updated: 31 Jan 2025
Generation Connection Guide.pdf
… 8 WORKSTREAM A: TRANSMISSION CONNECTION AND CHARGES … 20 Phase B3. Planning … Electricity Industry Participation Code 20101 FTR Financial Transmission Rights GIP Grid Injection Point Grid The system … Control And Data Acquisition system SSR Solution Study Report SOW Statement Of Work System Operator Transpower …
Generation Connection Guide V12
(PDF 864.82 KB)
Last updated: 05 Dec 2022
NZGP1 MCP ATTACHMENT H - STAKEHOLDER CONSULTATION SUMMARY.pdf
… that ensures with all facilities in service Transpower’s transmission system remains in a satisfactory state … It is one of the supporting attachments for our main report (‘Net Zero Grid Pathways Major Capex Proposal’) and … timing is needed. They recognise Transpower needs to start planning for major infrastructure in due time, but …
NZGP1 MCP ATTACHMENT H - STAKEHOLDER CONSULTATION SUMMARY.pdf
(PDF 687.19 KB)
Last updated: 07 Oct 2024
2 - Draft Assumptions Book v2.0 - tracked changes.pdf
… 16 2.3.2 Transmission network … work/industry/grid-pricing/transmission-pricing-methodology/assumptions-book. Deleted: … available information and trends. See Transmission Planning | Transpower TOV Transient over voltage TPM … Transmission pricing methodology TPR Transmission Planning Report Transpower IPP Individual price-quality path economic …
2 - Draft Assumptions Book v2.0 - tracked changes.pdf
(PDF 3.69 MB)
Last updated: 27 Aug 2019
Investor Presentation (August 2019).pdf
… Corporate Intent 2019/2020, the RCP3 Proposal, the Annual Report and Annual Review 2018 and the audited Financial … AA- Positive Moody’s Aa3 Stable Operating revenue breakdown Transmission 95% Other 1% System Operator 4% T R A N S M I S … Annual Review 2017/18 Transpower’s 2018 Transmission Planning Report 7 R E G U L AT I O N - Transpower is …
Investor Presentation (August 2019).pdf
(PDF 4.99 MB)