Resources
Displaying 551 - 560 of 1234
Last updated: 26 Aug 2022
solarZero submission on NZGP1 Stage 1 shortlist.pdf
… potential to increase this ramp rate via funding for non-transmission solutions. Whakamana i Te Mauri Hiko and … Transpower has identified in the Te Mauri Hiko series of reports. The Te Mauri Hiko work set out an exciting and … peak demand and the economics of doing so, to enable new transmission investment to be deferred. This analysis should …
solarZero submission on NZGP1 Stage 1 shortlist.pdf
(PDF 205.72 KB)
Last updated: 04 Sep 2018
TP System Operator Annual Review 2017-18.pdf
… as system operator. We’ve revised the format of our report this year. Foreword This year, we’ve identified and … our operational risk. Dispatch service enhancement We are planning to modernise the market system dispatch interface … existing New Zealand power system is an enabler: the core transmission network can accommodate significant solar PV in …
TP System Operator Annual Review 2017-18.pdf
(PDF 2.8 MB)
Last updated: 27 Feb 2017
TP_Sub_TPM_Supplementary_Consultation_24Feb2017.pdf
… 39 Appendix B: Economic Report Axiom Consulting … We also set out why this would produce a more durable Transmission Pricing Methodology (TPM) and have the best … We did this to front- load project establishment and planning and initiate preliminary TPM development work in …
TP_Sub_TPM_Supplementary_Consultation_24Feb2017.pdf
(PDF 1.33 MB)
Last updated: 31 Jan 2017
2015-16 TP System Operator Self Review online version.pdf
… power system, and security of supply. By publishing regular reports on the impact of these planned generator closures … with security 2..Demonstrating value for money 3. Planning for tomorrow 4. Strengthening relationships 5. … engineers were heavily engaged over the last year managing transmission and communication/protection asset outages …
Last updated: 16 Mar 2021
BenchmarkAgmnt_amendedcodereferences.pdf
… of the benchmark agreement incorporates new clause 37 'Reporting' and Schedule 5 'Service Measures' which were … AGREEMENT TRANSPOWER NEW ZEALAND LIMITED and [DESIGNATED TRANSMISSION CUSTOMER] Electricity Industry Participation … on the Customer to provide information to facilitate system planning, as set out in rule 3 of section III of part F of …
BenchmarkAgmnt_amendedcodereferences.pdf
(PDF 696.37 KB)
Last updated: 01 Nov 2018
Service Measure AP1 (HVDC Availability) additional information - July 2018.pdf
… elsewhere in the world, we have attached a series of Cigre reports on international HVDC availability. Please note: the … back-to-back systems and the remainder are point-to-point transmission systems utilizing overhead line and/or cable … It is believed that the data in Table V will be useful to planning engineers involved with reliability studies of HVDC …
Last updated: 30 Jul 2018
Service Measure AP1 HVDC availability additional information July 2018.pdf
… elsewhere in the world, we have attached a series of Cigre reports on international HVDC availability. Please note: the … back-to-back systems and the remainder are point-to-point transmission systems utilizing overhead line and/or cable … It is believed that the data in Table V will be useful to planning engineers involved with reliability studies of HVDC …
Last updated: 02 Nov 2022
March 2020.pdf
… 5 3 Priority 1 2 3 4 There was one high potential incident reported in March. A maintenance switcher tested the top … first was an HPI and involved a distressed man climbing a transmission tower. The Police were able to talk him down … Northpower to progress. Reviewing Asset Feedback with asset planning to clarify intent before formal submission to asset …
March 2020.pdf
(PDF 648.45 KB)
Last updated: 01 Jul 2020
Whakamana i Te Mauri Hiko Launch Brochure FINAL.pdf
… ‘Whakamana i te Mauri Hiko – enabling our energy future’ report. The facts are now beyond dispute: New Zealand has a … help New Zealand avoid building more power stations and transmission lines than we need. Figure 5: Electricity … to the grid faster and more efficiently. • Improved grid planning: Transpower is currently developing a Net Zero Grid …
Whakamana i Te Mauri Hiko Launch Brochure FINAL.pdf
(PDF 227.24 KB)
Last updated: 11 Aug 2021
Transpower_Brand Guide_July 2021.pdf
… crucial to the success of Transpower’s communications. The transmission lines represented in our logo are light blue. … Preliminary MCP signed off and option selection underway. Planning commenced to determine if second phase is required. … chain 08 Our Year in review 09 Data highlights 10 Chair report 12 Our Board 14 Chief Executive report 17 Our General …
Transpower_Brand Guide_July 2021.pdf
(PDF 10.59 MB)