Resources
Displaying 581 - 590 of 1207
Last updated: 26 Jul 2022
TP_SustainabilityStrategy_22-23.pdf
… MW of renewable generation connected annually Annual reporting of MW of new renewable generation connected Refine … Work programme to understand Transpower's role in transmission losses and prioritise our efforts in the areas where we do have control Planning networks We ensure the grid is resilient to climate …
TP_SustainabilityStrategy_22-23.pdf
(PDF 1.26 MB)
Last updated: 15 Sep 2022
Reclassification of Buller region assets September 2022.pdf
… region as connection assets under clause 23 of the new transmission pricing methodology (TPM), 1 and to explain the … Assets in Transpower’s latest and previous Transmission Planning Reports as a “spur”5 b. the Affected Assets do not provide …
Last updated: 23 Dec 2016
Generation Fault Ride Through.pdf
… http://www.systemoperator.co.nz/ TRANSPOWER REPORT: Generation Fault Ride Through (FRT) Assumptions 3 1. … as follows: a. Maximum FL – All generating units and transmission assets in service during a maximum loading … Details of the maximum FL is published in 2016 Transmission Planning Report, Ten Year Forecast of Fault Levels, …
Generation Fault Ride Through.pdf
(PDF 611.76 KB)
Last updated: 28 Sep 2016
TP Schedules 27 Sept.pdf
… 2016 INTEGRATED TRANSMISSION PLAN SCHEDULES SEPTEMBER 2016 2 Contents 1 … - 15.4 - 56.4 71.8 42.5 44.3 68.8 35.7 22.7 214.1 Grid R&R1 transmission lines 62.6 64.1 75.2 76.6 72.8 351.2 74.4 76.9 … decommissioning-report-and-appendices and … Series Compensation. Also see Transmission Planning Report 2015—Section 6.3, 6.4 but the links above …
TP Schedules 27 Sept.pdf
(PDF 853.23 KB)
Last updated: 20 Dec 2024
WBoP - Attachment 5 - Options analysis
… but a different period can be used where appropriate. Some transmission assets have long lives, greater than 20 years, … investment options have been estimated using concept design reports or internal costs, depending on the level of … Practice (GEIP) and as such we have ensured that the planning and performance standards used to determine the …
WBoP - Attachment 5 - Options analysis.pdf
(PDF 869.67 KB)
Last updated: 06 Dec 2022
2023 SOSA - Reference Case and Sensitivities Consultation Document.pdf
… energy margins assess the adequacy of generation and HVDC transmission capacity to meet expected electricity demand … Industry Company’s Gas Market Settings Investigation6 final report. In this sensitivity, we assume that gas supply post … market insights paper8. While the SOSA is not a short-term planning tool, this sensitivity gives an indication of how …
Last updated: 28 Apr 2020
Visiting Transpower Assets Guidebook for ECs.pdf
… 10 Hazard identification & risk management 12 11 Incident reporting requirements 13 12 Personal protective equipment … and Safety Site Specific Plan Note: If an EC is visiting a Transmission Lines site you will need to have your own … discuss hazards associated with the asset which the EC is planning to visit (the LOLO should check the Connect …
Visiting Transpower Assets Guidebook for ECs.pdf
(PDF 1.71 MB)
Last updated: 28 Apr 2020
Visiting Transpower Assets Guidebook for ECs.pdf
… 10 Hazard identification & risk management 12 11 Incident reporting requirements 13 12 Personal protective equipment … and Safety Site Specific Plan Note: If an EC is visiting a Transmission Lines site you will need to have your own … discuss hazards associated with the asset which the EC is planning to visit (the LOLO should check the Connect …
Visiting Transpower Assets Guidebook for ECs.pdf
(PDF 1.71 MB)
Last updated: 28 Apr 2020
Visiting Transpower Assets Guidebook for ECs.pdf
… 10 Hazard identification & risk management 12 11 Incident reporting requirements 13 12 Personal protective equipment … and Safety Site Specific Plan Note: If an EC is visiting a Transmission Lines site you will need to have your own … discuss hazards associated with the asset which the EC is planning to visit (the LOLO should check the Connect …
Visiting Transpower Assets Guidebook for ECs.pdf
(PDF 1.74 MB)
Last updated: 01 Aug 2023
[Draft] Transpower Capital Expenditure Input Methodology (IM Review 2023) Amendment Determination 2023 - 21 June 2023_TPComments.docx
… prior to a regulatory period 30 SUBPART 1 Integrated transmission plan 30 SUBPART 1A IPP proposal … 0. asset management; 0. asset security; 0. augmentation and planning; 0. business cases, including cost-benefit … to carry out some or all of the verification; verification report means a report prepared by a verifier in accordance …