Resources
Displaying 61 - 70 of 1259
Last updated: 16 Aug 2018
Unison Submission - Transmission Alternatives Consultation - July 2018.pdf
… PO Box 1021 WELLINGTON Email: [email protected] TRANSMISSION ALTERNATIVES ENGAGEMENT PROCESS: CONSULTATION … TA’s that will meet the demand need. The Transmission Planning Reports will be the key information that TA providers will …
Last updated: 04 Jul 2017
Chapter 11 - Central North Island Regional Plan 2017 - FINAL.pdf
… Chapter 11: Central North Island Regional Plan 2017 Annual Planning Report © Transpower New Zealand Limited 2017. All rights … North Island Regional Plan 11.1 Regional overview and transmission system 11.2 Central North Island demand 11.3 …
Last updated: 04 Jul 2017
Chapter 18 - South Canterbury Regional Plan 2017 - FINAL.pdf
… Chapter 18: South Canterbury Regional Plan 2017 Transmission Planning Report © Transpower New Zealand Limited 2015. All rights …
Last updated: 04 Jul 2017
Chapter 15 - Nelson-Marlborough Regional Plan 2017 - FINAL.pdf
… Nelson-Marlborough Regional Plan 15.1 Regional overview and transmission system 15.2 Nelson-Marlborough demand 15.3 … 15: Nelson-Marlborough Regional Plan 2017 Transmission Planning Report © Transpower New Zealand Limited 2017. All rights …
Last updated: 21 Jan 2021
Helicopter Use near transmission linesDec2020.pdf
… De ce m be r 2 02 0 Public Helicopter use around transmission lines Transpower is the state-owned enterprise … accidents. Between 2014-19 there were 28 wire strikes reported to the Civil Aviation Authority (CAA). The … and maintaining situational awareness. Proper planning before operations and ongoing training on wire …
Last updated: 02 Nov 2018
Transpower_The_Role_of_Peak_Pricing_for_Transmission_2Nov2018.pdf
… 4 Coherent approach to distribution and transmission pricing … that any reform of the TPM should be evidence based. This report provides our response to the Authority’s letter and … price signal, conducted by Transpower staff (power systems planning and system operations); and the results of …
Last updated: 02 Nov 2018
Transpower_The_Role_of_Peak_Pricing_for_Transmission_2Nov2018.pdf
… 4 Coherent approach to distribution and transmission pricing … that any reform of the TPM should be evidence based. This report provides our response to the Authority’s letter and … price signal, conducted by Transpower staff (power systems planning and system operations); and the results of …
Last updated: 26 May 2016
Transpower - Transmission Tomorrow26052016.pdf
… changing electricity dynamics 14 A reliable and robust transmission service will enable change 16 The wax and wane … A radically different business Contents 24 Meeting future transmission needs 29 Talk to us 01 Transpower operates at … the scenarios by themselves don’t provide a truly useful planning tool. To help guide our planning, we have found it …
Last updated: 22 Sep 2022
2022 Service Measures Report.pdf
… Service Measures Report 2022 September 2022 Service Measures Report 2022 … 3.4. Linking service measures to planning … provide to our customers • the performance of our regulated transmission business during Disclosure Year 2022 (DY 2022; … 1 below). They include provision of regulated electricity transmission services, provision of the system operator …
Last updated: 08 Nov 2021
Grid Outputs Report 2021.pdf
… TRANSPOWER NEW ZEALAND | Grid Outputs Report 2021 1 2021 Grid Outputs Report TRANSPOWER NEW … 12 3.4. Linking Grid Outputs to Planning … while preparing for RCP4 • the performance of our regulated transmission business during Disclosure Year 20211 (July … 1 below). They include provision of regulated electricity transmission services, provision of the system operator …