Resources
Displaying 631 - 640 of 1352
Last updated: 24 Feb 2021
Interim result NZX table.pdf
… Results Announcement to the Market – 25 February 2021 Reporting Period 01 July 2020 to 31 December 2020 (FY21) … 33% from the previous period’s result of $105.2 million. • Transmission revenue declined 6.4% to $451.8 million (2019: … projects will now be reconsidered. “Work to progress the Transmission Pricing Methodology (TPM) has also been a …
Last updated: 15 Jun 2018
Engagement Paper 3 (June 2018).pdf
… can include asset health. This arrangement helps ensure our planning appropriately recognises customer preferences, and … agreed to replace the remaining life targets with pilot reporting of Asset Health, which aligns with our current … 6 Transpower, July 2015. Initiatives Plan: For regulated transmission services. Transpower website. URL: …
Last updated: 02 Jul 2024
AUFLS Transition Quarterly Industry Session - June 2024.pdf
… Why are we transitioning? EIPC Requirement AUFLS Technical Report Informed by Who is involved? When is the transition … to prevent cascade failure Study Network? • North Island Transmission Network Study Period? • 1 month at a time, over … to prevent cascade failure Study Network? • North Island Transmission Network Study Period? • 1 month at a time, over …
Last updated: 15 Sep 2022
Reclassification of Buller region assets September 2022.pdf
… region as connection assets under clause 23 of the new transmission pricing methodology (TPM), 1 and to explain the … Assets in Transpower’s latest and previous Transmission Planning Reports as a “spur”5 b. the Affected Assets do not provide …
Last updated: 16 May 2018
Attachment C Consultation Summary.pdf
… the nine specific questions asked in the consultation report, plus any general comments of relevance to specific … to manage their financial risk through use of financial transmission rights and other measures, as well as, the lake … 5 2.2 Long list of options Q2 Do you agree that non-transmission solutions are not suitable to meet this …
Last updated: 28 Sep 2016
TP Schedules 27 Sept.pdf
… 2016 INTEGRATED TRANSMISSION PLAN SCHEDULES SEPTEMBER 2016 2 Contents 1 … - 15.4 - 56.4 71.8 42.5 44.3 68.8 35.7 22.7 214.1 Grid R&R1 transmission lines 62.6 64.1 75.2 76.6 72.8 351.2 74.4 76.9 … decommissioning-report-and-appendices and … Series Compensation. Also see Transmission Planning Report 2015—Section 6.3, 6.4 but the links above …
Last updated: 01 Aug 2023
TP_SystemOperatorStrategicPlan_Jun23_03_FINAL-A.pdf
… operating is changing at an accelerating rate, evidenced by reports from groups such as the Market Development Advisory … to provide direction for our organisation’s more detailed planning for carrying out the system operator role, embodied … at lower cost than grid- connected generation and transmission assets? Using this evidence from overseas, we …
Last updated: 06 Apr 2017
Engagement Paper 2 - April 2017.pdf
… APRIL 2017 4 5. September 2017: We will publish a Services Report as part of our Integrated Transmission Plan 2017 submission. In addition to reporting … merit in the use of service targets as a driver for grid planning. The submissions received along with a summary of …
Last updated: 05 Apr 2017
Engagement Paper 2.pdf
… APRIL 2017 4 5. September 2017: We will publish a Services Report as part of our Integrated Transmission Plan 2017 submission. In addition to reporting … merit in the use of service targets as a driver for grid planning. The submissions received along with a summary of …
Last updated: 20 Dec 2024
WBoP - Attachment 5 - Options analysis
… but a different period can be used where appropriate. Some transmission assets have long lives, greater than 20 years, … investment options have been estimated using concept design reports or internal costs, depending on the level of … Practice (GEIP) and as such we have ensured that the planning and performance standards used to determine the …