Resources
Displaying 641 - 650 of 1353
Last updated: 20 Dec 2024
WBoP - Attachment 5 - Options analysis
… but a different period can be used where appropriate. Some transmission assets have long lives, greater than 20 years, … investment options have been estimated using concept design reports or internal costs, depending on the level of … Practice (GEIP) and as such we have ensured that the planning and performance standards used to determine the …
Last updated: 23 Dec 2016
Generation Fault Ride Through.pdf
… http://www.systemoperator.co.nz/ TRANSPOWER REPORT: Generation Fault Ride Through (FRT) Assumptions 3 1. … as follows: a. Maximum FL – All generating units and transmission assets in service during a maximum loading … Details of the maximum FL is published in 2016 Transmission Planning Report, Ten Year Forecast of Fault Levels, …
Last updated: 01 Aug 2023
[Draft] Transpower Capital Expenditure Input Methodology (IM Review 2023) Amendment Determination 2023 - 21 June 2023_TPComments.docx
… prior to a regulatory period 30 SUBPART 1 Integrated transmission plan 30 SUBPART 1A IPP proposal … 0. asset management; 0. asset security; 0. augmentation and planning; 0. business cases, including cost-benefit … to carry out some or all of the verification; verification report means a report prepared by a verifier in accordance …
Last updated: 06 Dec 2022
8. ELECTRA submission to Transpower's RCP4 Consultation - 3 November 2022.pdf
… 'Electrifying the economy is not just about adding transmission capacity, it is also about making sure the … our approach for embedding innovation and efficiency in our planning? If not, please let us know why. On page 40 of its … Page 9 of 13 Question Comment Q16 How should Transpower report on our progress on delivering resilience programmes? …
Last updated: 06 Dec 2022
2023 SOSA - Reference Case and Sensitivities Consultation Document.pdf
… energy margins assess the adequacy of generation and HVDC transmission capacity to meet expected electricity demand … Industry Company’s Gas Market Settings Investigation6 final report. In this sensitivity, we assume that gas supply post … market insights paper8. While the SOSA is not a short-term planning tool, this sensitivity gives an indication of how …
Last updated: 20 Sep 2022
Submission Summary - Grid Service Engagement Paper
… 1. Planned outage performance to ensure efficient outage planning is achieved and 2. New grid connections to ensure … of future load forecasts. GP-M – Momentary Interruptions Reporting 10. Do you use the information reported on in the … (c) Given the uncertainties created by the shift to the new Transmission Pricing Methodology we recommend that …
Last updated: 15 Aug 2022
Submission Summary - Grid Service Engagement Paper 1.pdf
… 1. Planned outage performance to ensure efficient outage planning is achieved and 2. New grid connections to ensure … of future load forecasts. GP-M – Momentary Interruptions Reporting 10. Do you use the information reported on in the … (c) Given the uncertainties created by the shift to the new Transmission Pricing Methodology we recommend that …
Last updated: 26 Jul 2022
TP_SustainabilityStrategy_22-23.pdf
… MW of renewable generation connected annually Annual reporting of MW of new renewable generation connected Refine … Work programme to understand Transpower's role in transmission losses and prioritise our efforts in the areas where we do have control Planning networks We ensure the grid is resilient to climate …
Last updated: 26 Jun 2024
DTA 10 April 2024
… 10 April 2024 Schedule 12.6 cl 1.1 Default transmission agreement template Default Transmission … 47 35. DEFINITIONS 47 36. SERVICE STANDARDS 48 37. REPORTING 49 Electricity Industry Participation Code 2010 … on the Customer to provide information to facilitate system planning, as set out in clause 12.54 of the Code); and (c) …
Last updated: 03 Nov 2025
2026 SOSA - Reference Case and Sensitivities Consultation
… for the 10-year modelled period (2026- 2035). We could then report on how the market is actually tracking against this … Margin (SI-WEM): Adequacy of generation and north-to- south transmission capacity to meet expected South Island … https://www.transpower.co.nz/system-operator/planning-future/system-security-forecast …