Resources
Displaying 641 - 650 of 1234
Last updated: 29 Sep 2017
TP_Sub_Additional_Information_Capex_IM_11August2017.pdf
… investment test” Network performance System-wide measures, reporting only. New customer-facing measures, some with … (Conversely for lower quality).5 In 2016 we published Transmission Tomorrow in the context of advancing technology … for the supporting documents6 (asset management plan, planning report, and performance report). We are keen to …
TP_Sub_Additional_Information_Capex_IM_11August2017.pdf
(PDF 748.55 KB)
Last updated: 30 Apr 2018
TP_Sub_Capex_IM_Revised_draft_amendments_determination_24April2018.pdf
… 2424 SUBPART 1 Integrated transmission plan … Commented [TP6]: It is unlikely we will have sufficient planning certainty over 5 years to stipulate pre-set … key issues being addressed with reference to the planning report which is an ITP supporting document; (b) estimates of …
Last updated: 13 Feb 2023
Quality_Alert_Service Contingency and Risk Mitigation - 2023-001.pdf
… accountabilities: • Check weekly Significant Outages Report and be aware of projects tagged Risk Mitigation Plan … has potential to create un-necessary Service Risk to the transmission system and our customers. ACTIONS TAKEN TO … Risk is planned for and managed. That Significant Outages report is checked and, Service Contingency and Risk …
Last updated: 03 Jul 2024
Connection Management Framework – Process Document V2 July 2024
… structures and/or equipment in Schedule 6 of the Default Transmission Agreement Template (as defined in the … 2.4 Conceptual design Has the applicant included a report of preliminary design of the project, including … undertaken or planned (see also section 2.9 below); • The planning consultant and environmental specialists engaged to …
Last updated: 27 Feb 2025
TranspowerTPM_Issues_and_Proposals
… Authority By email: [email protected] Dear Carl Transmission Pricing Methodology Consultation TlanspDWel … Electricity Authority Date: 1 March 2013 Contact Ross Parry Planning and Regulatory Manager 96 The Terrace WELLINGTON … directly part of our submission, we have attached the CEG report as Appendix B for completeness. CEG identified some …
TranspowerTPM_Issues_and_Proposals.pdf
(PDF 1.83 MB)
Last updated: 06 Dec 2022
2. Vector submission on RCP4.pdf
… should have the opportunity to review the Verifier’s report ahead of submissions to provide an opportunity to … of this investment. • We would also like to understand the planning philosophy behind the expenditure increase (for example, maintaining N-1, or provision for transmission lines to connect PV in the north) 10. It is …
2. Vector submission on RCP4.pdf
(PDF 155.72 KB)
Last updated: 16 Dec 2022
Response to Independent Review F4B Rev1.pdf
… and suggested some opportunities for improvement. This report provides Transpower’s response to the suggested … functionality offline. HVDC High Voltage Direct Current transmission system IGBT Insulated Gate Bipolar Transistor … of the two LCC poles that make up interisland bipolar HVDC transmission system. Pole 2 was commissioned in 1992. Pole 3 …
Response to Independent Review F4B Rev1.pdf
(PDF 668.34 KB)
Last updated: 10 May 2018
AKLDEmergingStrategy.pdf
… technology, industry, and electricity. This is our second report about our work to develop a long-term strategy to … in the future we can: • provide efficient and resilient transmission services; • sustain operational and maintenance … happen as many of the generation options have been on the planning books for well over five years. In any event, even …
AKLDEmergingStrategy.pdf
(PDF 5.78 MB)
Last updated: 02 Nov 2022
April 2020.pdf
… 5 3 Priority 1 2 3 4 There were no high potential incidents reported during April. For the second consecutive month … Asset Feedback • Reviewing Asset Feedback with asset planning to clarify intent before formal submission to asset … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to …
April 2020.pdf
(PDF 653.87 KB)
Last updated: 01 Apr 2023
TPM Decision - Reclassification of Buller region assets - 1 April 2023.pdf
… region as connection assets under clause 23 of the new transmission pricing methodology (TPM), 1 and to explain the … Assets in Transpower’s latest and previous Transmission Planning Reports as a “spur”;5 b. the Affected Assets do not provide …