TPM Decision - Reclassification of Buller region assets - 1 April 2023.pdf
… region as connection assets under clause 23 of the new transmission pricing methodology (TPM), 1 and to explain the … Assets in Transpower’s latest and previous Transmission Planning Reports as a “spur”;5 b. the Affected Assets do not provide …
Last updated: 30 Jul 2020
New Generation Connections FAQ - Web copy.pdf
… terms of engaging in the Electricity Market including the Transmission Pricing Methodology and the Benchmark … well in advance. This should also be considered in your planning. Our Transmission Planning Report includes an overview of Transpower's Enhancement and …
Last updated: 02 Nov 2022
April 2020.pdf
… 5 3 Priority 1 2 3 4 There were no high potential incidents reported during April. For the second consecutive month … Asset Feedback • Reviewing Asset Feedback with asset planning to clarify intent before formal submission to asset … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to …
Last updated: 26 Jun 2023
2023 SOSA - Final Appendices - Final Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 36 Appendix 5: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 08 May 2023
2023 SOSA - Draft Appendices - Consultation Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 36 Appendix 5: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 03 Sep 2018
Fonterra submission.pdf
… If not, what other factors should we be considering when planning for the future of the grid? Fonterra broadly … of energy in New Zealand and acknowledges the Te Mauri Hiko report in informing this discussion. In particular, we agree … of the uncertainties. Fonterra agrees with the use of the transmission planning report to construct investment and …
Last updated: 26 Nov 2020
All cross-submissions on TPM First Mover Disadvantage Consultation.pdf
… at web site https://www.transpower.co.nz/industry/transmission-pricing-methodology- … are obtained if Transpower’s traditional centralised planning mindset is replaced by a customer centralised … shortages. 8. Transpower’s own Whakamana i Te Mauri Hiko Report 2 has identified a forecast significant increase in …
Last updated: 27 Nov 2019
CAP Newsletter July 2019.pdf
… panel’s advice and insights to better inform its business planning and decision making. We believe that though … service looks like (performance measures), and the set of reporting Transpower is required to prepare during RCP3. The … has expressed an interest in a range of topics including: transmission investment and pricing; Transpower’s roadmap to …
Last updated: 24 Sep 2019
Stakeholder Forum 17 December 2017 - presentation.pdf
… strategic objectives 3. Better understand and adapt to the Transmission Tomorrow future states 4 I N N O VAT I O N I N … of emerging technologies (we’ve published two investigative reports) Play an active role in shaping our future R E C E … discussions during an event are difficult • Time spent in planning is not time wasted 27 W HAT ARE W E W O RKI NG O N …
Last updated: 15 Dec 2017
17 December 2017 Stakeholder Forum.pdf
… strategic objectives 3. Better understand and adapt to the Transmission Tomorrow future states 4 I N N O VAT I O N I N … of emerging technologies (we’ve published two investigative reports) Play an active role in shaping our future R E C E … discussions during an event are difficult • Time spent in planning is not time wasted 27 W HAT ARE W E W O RKI NG O N …