Resources
Displaying 701 - 710 of 1234
Last updated: 07 Sep 2017
Battery Storage in New Zealand.pdf
… distribution networks and grid substations could alter our transmission business by covering short-term imbalances in … equation. Later this year, we aim to publish a companion report exploring the opportunities and challenges of solar … impact considerations as well as consenting and planning constraints. 350 300 250 200 150 100 50 0 P re se n …
Battery Storage in New Zealand.pdf
(PDF 1.94 MB)
Last updated: 07 Sep 2017
Battery Storage in New Zealand.pdf
… distribution networks and grid substations could alter our transmission business by covering short-term imbalances in … equation. Later this year, we aim to publish a companion report exploring the opportunities and challenges of solar … impact considerations as well as consenting and planning constraints. 350 300 250 200 150 100 50 0 P re se n …
Battery Storage in New Zealand.pdf
(PDF 1.94 MB)
Last updated: 10 May 2017
Commerce Commission workshop presentation - asset mangement and ITP update - October 2016 - (Final Published Version) [Read-Only].pdf
… material is consistent with Transpower’s 2016 Integrated Transmission Plan update, including our 2016 Asset … & Development (Nikki Newham) 5. ICT (Cobus Nel) 6. Planning (Ross Parry) 3 1. Asset management journey 4 2. … and seek feedback • June 2017: Publish a Services Report on the measures as part of the 2017 ITP that sets the …
Last updated: 30 Nov 2020
Privacy Notice.pdf
… incident on- site will have a health and safety incident report completed, and that report (including any personal … service providers such as processes around commissioning transmission assets and post-commissioning; • providing a … easements; • consultation on options for locating or moving transmission assets on or around their property; • making …
Privacy Notice.pdf
(PDF 252.16 KB)
Last updated: 11 Feb 2025
Redclyffe 220 kV Switchyard Resilience - Shortlist Consultation
… will also enhance the capabilities of the national transmission grid in this region. The costs associated with … 16. The cost to consumers of this unserved energy was reported by the System Operator to be in the range $232 - … need for resiliency to be front of mind in asset management planning and investment strategies. Good electricity …
Last updated: 11 Feb 2025
Redclyffe 220 kV Switchyard Resilience - Attachment 1 - Options analysis
… both the initial recovery and rebuild of Redclyffe, planning work between Transpower and Unison Networks and … Increased? Flood Resilience Option 1 Repair Do Minimal Transmission Redclyffe Complete already • Redclyffe repaired … quality and was determined in our commissioned work design report. The range of cost uncertainty is tested in the …
Last updated: 31 May 2022
27. Energy Estate and Elemental Group NZ Renewable Energy Zones Consultation April 2022 Elemental Energy Estate.pdf
… wind, offshore wind, solar, green hydrogen/e-fuels and transmission projects focused on renewable energy zones and … Traditional owners first Commercial Development Master Planning Transition planning Sustainable mining Hydrogen 4 … Indicators of Sustainable Development (Goal 15) • CDP Reporting Framework • InfluenceMap Methodology 4 Skills, …
Last updated: 01 Dec 2017
OTB-HAY preferred option December 2017.pdf
… have looked at bringing the project forward. However, the planning, procurement and enabling work prior to an outage … All rights reserved. 4 Glossary ACOT Avoided cost of transmission AoB Area of benefit Authority Electricity … is based on Transpower’s 2016 Transmission Planning Report (TPR). The demand forecast also incorporates electric …
OTB-HAY preferred option December 2017.pdf
(PDF 1.56 MB)
Last updated: 28 Aug 2020
New Generation Connections FAQ - Web copy Aug 2020.pdf
… terms of engaging in the Electricity Market including the Transmission Pricing Methodology and the Benchmark … well in advance. This should also be considered in your planning. Our Transmission Planning Report includes an overview of Transpower's Enhancement and …
New Generation Connections FAQ - Web copy Aug 2020.pdf
(PDF 143.05 KB)
Last updated: 02 Feb 2024
2023 SOROP Review - Draft SOROP (18 December 2023).pdf
… of an immediate event is an unexpected outage of a major transmission line or generating plant. outage means a … specialist). (b) any other personnel responsible for reporting to the system operator on the specified … clause 6.5. (b) for developing events, the methodology for planning for disconnection of demand (nine seven days out to …
2023 SOROP Review - Draft SOROP (18 December 2023).pdf
(PDF 243.37 KB)