Resources
Displaying 701 - 710 of 1385
Last updated: 30 Apr 2021
Consultation document_Prioritising the enablement of new wind and solar generation_30 April 2021.pdf
… consumption. The output from NZGP will be a long-term transmission plan, showing how we envisage the transmission … model and in turn, help prioritise our transmission planning efforts. Although the generation expansion … as included in the Wind Generation Stack Update (2020) report by Roaring40s Wind Power Ltd report, available on the …
Last updated: 27 Feb 2025
TP_Sub_Appendix_C_Castalia_Response_67_Percentile_WACC_29_Aug14.pdf
… June 2014 3 Castalia, “The Rational Response of a Regulated Transmission Company to a Low WACC” (report prepared for Transpower New Zealand Ltd, 1 May 2014) … electricity (due to a less optimal mix of generation and transmission).Because it is not obvious if economic …
Last updated: 02 Nov 2022
July 2021 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 2 / Health, Safety & Wellbeing | Health & Safety … the MAD and a landowner observing two people climbing a transmission tower on his property. There were no injuries … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
Last updated: 02 Nov 2022
July 2021.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 2 / Health, Safety & Wellbeing | Health & Safety … the MAD and a landowner observing two people climbing a transmission tower on his property. There were no injuries … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
Last updated: 27 Feb 2025
TranspowerTPM_Issues_and_Proposals
… Authority By email: [email protected] Dear Carl Transmission Pricing Methodology Consultation TlanspDWel … Electricity Authority Date: 1 March 2013 Contact Ross Parry Planning and Regulatory Manager 96 The Terrace WELLINGTON … directly part of our submission, we have attached the CEG report as Appendix B for completeness. CEG identified some …
Last updated: 22 Dec 2025
Connection Management Framework - process document V3.0 22 December 2025
… structures and/or equipment in Schedule 6 of the Default Transmission Agreement Template (as defined in the … 2.4 Conceptual design Has the applicant included a report of preliminary design of the project, including … undertaken or planned (see also section 2.9 below); • The planning consultant and environmental specialists engaged to …
Last updated: 29 Sep 2017
TP_Sub_Additional_Information_Capex_IM_11August2017.pdf
… investment test” Network performance System-wide measures, reporting only. New customer-facing measures, some with … (Conversely for lower quality).5 In 2016 we published Transmission Tomorrow in the context of advancing technology … for the supporting documents6 (asset management plan, planning report, and performance report). We are keen to …
Last updated: 09 Sep 2025
HVDC MCP - Attachment 2 - Need Demand and Generation Scenarios
… and Generation Scenarios Attachment 3 – Cable Condition Report Attachment 4 – Short-list of Investment Options … 1.4 Integrated transmission plan … termination requirements of the replacement cables. We are planning to work on the termination stations alongside the …
Last updated: 06 Dec 2022
2. Vector submission on RCP4.pdf
… should have the opportunity to review the Verifier’s report ahead of submissions to provide an opportunity to … of this investment. • We would also like to understand the planning philosophy behind the expenditure increase (for example, maintaining N-1, or provision for transmission lines to connect PV in the north) 10. It is …
Last updated: 10 May 2018
AKLDEmergingStrategy.pdf
… technology, industry, and electricity. This is our second report about our work to develop a long-term strategy to … in the future we can: • provide efficient and resilient transmission services; • sustain operational and maintenance … happen as many of the generation options have been on the planning books for well over five years. In any event, even …