Resources
Displaying 711 - 720 of 1207
Last updated: 22 Mar 2021
Residual Charges and the Treatment of Batteries Options Consultation March 2021.pdf
… residual charge to grid-connected batteries under the new transmission pricing methodology (TPM) and potential options … Authority (Authority) released its final decision on its transmission pricing review and published new TPM Guidelines … on these matters. 5. The Authority also commissioned a report from Sense Partners on electricity storage and the …
Last updated: 22 Mar 2021
Residual Charges and the Treatment of Batteries Options Consultation March 2021 FINAL.pdf
… residual charge to grid-connected batteries under the new transmission pricing methodology (TPM) and potential options … Authority (Authority) released its final decision on its transmission pricing review and published new TPM Guidelines … on these matters. 5. The Authority also commissioned a report from Sense Partners on electricity storage and the …
Last updated: 01 Aug 2024
Summary and Transpower's response - 1 August 2024.pdf
… summary and response to fallen tower investigation report Summary Immediately after the tower fall at Glorit on … that our investigation has concluded and we have our final report, we have clarity on the immediate cause of the event … We provide trades training and compliance training for transmission-specific activities and wider electricity …
Summary and Transpower's response - 1 August 2024.pdf
(PDF 232.12 KB)
Last updated: 21 Sep 2022
System Operator annual self-review 21-22.pdf
… 2 1.2 Structure of the report … by the Authority (which focussed on the operation of the transmission system), we agree that there is opportunity to … National Grid Electricity System Operator, Scottish Power Transmission Electricity Networks, and the Energy Systems …
System Operator annual self-review 21-22.pdf
(PDF 959.7 KB)
Last updated: 03 Mar 2023
Connection Application Form
… to progress an application to investigate connection to the transmission grid, as per the Connections Management … Conceptual design Has the applicant included a report of preliminary design of the project, including … the applicant included a report considering connection and transmission capacity for the proposed connection (for …
Connection Application Form
(DOCX 957.1 KB)
Last updated: 17 Mar 2021
Mercury submission on Draft EDGS Variations Feb 2021.pdf
… Clear need for electrification of economy Several recent reports have outlined the clear need for New Zealand’s … heat, will add significant demand for new generation and transmission investments. Given the long lead time required to plan for and build new transmission assets Transpower is right to ensure the key …
Mercury submission on Draft EDGS Variations Feb 2021.pdf
(PDF 144.01 KB)
Last updated: 04 Jul 2017
Appendix B - Fault levels 2017 - FINAL.pdf
… presents an update to the 10 year forecast fault levels report. The Connection Code contained in Schedule 8 of the … ground fault current, respectively, for all of Transpower’s transmission buses. Both tables list the 10 year forecast … and new generation detailed in the 2017 Transmission Planning Report. We represented new transmission lines in …
Appendix B - Fault levels 2017 - FINAL.pdf
(PDF 1.03 MB)
Last updated: 08 Jan 2018
TP_Sub_CapexIM_Draft_Determination_Appendix_A_21Dec2017.pdf
… 262622 SUBPART 1 Integrated transmission plan … asset management; (b) asset security; (c) augmentation and planning; Commented [TP26]: This definition no longer … key issues being addressed with reference to the planning report which is an ITP supporting document; (b) estimates of …
Last updated: 16 Aug 2018
Unison Submission - TA Consultation - July 2018.pdf
… PO Box 1021 WELLINGTON Email: [email protected] TRANSMISSION ALTERNATIVES ENGAGEMENT PROCESS: CONSULTATION … TA’s that will meet the demand need. The Transmission Planning Reports will be the key information that TA providers will …
Unison Submission - TA Consultation - July 2018.pdf
(PDF 263.56 KB)
Last updated: 07 Mar 2025
Submission Upper South Islan Short List Consulations Response Final
… South Island Upgrade Major Capex Short List Consultation Report dated December 2024. As indicated in the report we … to Transpower through the reconductoring of existing transmission infrastructure with HVCRC® Conductors including … through increased amperage without the need for addition transmission line construction including an opportunity to …