Resources
Displaying 711 - 720 of 1385
Last updated: 01 Apr 2023
TPM Decision - Reclassification of Buller region assets - 1 April 2023.pdf
… region as connection assets under clause 23 of the new transmission pricing methodology (TPM), 1 and to explain the … Assets in Transpower’s latest and previous Transmission Planning Reports as a “spur”;5 b. the Affected Assets do not provide …
Last updated: 30 Jul 2020
New Generation Connections FAQ - Web copy.pdf
… terms of engaging in the Electricity Market including the Transmission Pricing Methodology and the Benchmark … well in advance. This should also be considered in your planning. Our Transmission Planning Report includes an overview of Transpower's Enhancement and …
Last updated: 13 Feb 2023
Quality_Alert_Service Contingency and Risk Mitigation - 2023-001.pdf
… accountabilities: • Check weekly Significant Outages Report and be aware of projects tagged Risk Mitigation Plan … has potential to create un-necessary Service Risk to the transmission system and our customers. ACTIONS TAKEN TO … Risk is planned for and managed. That Significant Outages report is checked and, Service Contingency and Risk …
Last updated: 16 Dec 2022
Response to Independent Review F4B Rev1.pdf
… and suggested some opportunities for improvement. This report provides Transpower’s response to the suggested … functionality offline. HVDC High Voltage Direct Current transmission system IGBT Insulated Gate Bipolar Transistor … of the two LCC poles that make up interisland bipolar HVDC transmission system. Pole 2 was commissioned in 1992. Pole 3 …
Last updated: 01 Sep 2025
CACTIS Consultation Final
… The system operator is responsible for operating the transmission components of New Zealand's power system, which … of existing assets • conduct power system studies for planning purposes • investigate power system common quality … frames for asset owners to submit a final connection study report, and for the system operator to review it? Q12. Do …
Last updated: 26 Jun 2023
2023 SOSA - Final Appendices - Final Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 36 Appendix 5: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 08 May 2023
2023 SOSA - Draft Appendices - Consultation Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 36 Appendix 5: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 26 Nov 2020
All cross-submissions on TPM First Mover Disadvantage Consultation.pdf
… at web site https://www.transpower.co.nz/industry/transmission-pricing-methodology- … are obtained if Transpower’s traditional centralised planning mindset is replaced by a customer centralised … shortages. 8. Transpower’s own Whakamana i Te Mauri Hiko Report 2 has identified a forecast significant increase in …
Last updated: 27 Nov 2019
CAP Newsletter July 2019.pdf
… panel’s advice and insights to better inform its business planning and decision making. We believe that though … service looks like (performance measures), and the set of reporting Transpower is required to prepare during RCP3. The … has expressed an interest in a range of topics including: transmission investment and pricing; Transpower’s roadmap to …
Last updated: 03 Sep 2018
Fonterra submission.pdf
… If not, what other factors should we be considering when planning for the future of the grid? Fonterra broadly … of energy in New Zealand and acknowledges the Te Mauri Hiko report in informing this discussion. In particular, we agree … of the uncertainties. Fonterra agrees with the use of the transmission planning report to construct investment and …