Resources
Displaying 741 - 750 of 1234
Last updated: 08 Mar 2023
Transpower submission: Price discovery in a renewables-based electricity system
… networks [MDAG partial support] Coordination with transmission investment that underpins the market While the … only we consider an omission for its context is the role of transmission capacity. Sufficient grid capacity is a key … to the status quo which will assist the SO in its security planning. In addition to Code development, this option would …
Last updated: 16 May 2018
OTB-HAY A Reconductor Application.pdf
… our Application ......................... 34 8.4 Effect on transmission charges … 40 Attachment A: Condition Assessment Report Attachment B: Options and Costing Report Attachment … demand forecast is based on Transpower’s 2016 Transmission Planning Report (TPR). The demand forecast also incorporates …
OTB-HAY A Reconductor Application.pdf
(PDF 1.35 MB)
Last updated: 01 Aug 2016
Process for Assessment of Parallel Grid Exit Point Applications.pdf
… Grid Exit Point Applications 26/10/2010 System Operator Report: Process for Assessment of Parallel Grid Exit Point … a Grid Exit Point parallel connection - Agreement Process (Planning Time Frame). … Step Action 1 Check sites are not backfeeding onto a transmission circuit without an effective earth. If so, take …
Last updated: 21 Aug 2020
FY20 Annual Result Disclosure.pdf
… to the market Name of issuer TRANSPOWER NEW ZEALAND LIMITED Reporting Period 12 months to 30 June 2020 Previous … to our suppliers and offered deferred payment terms for transmission charges to affected customers. Ms Dunphy says … Cable replacement – all of which have been years in the planning and required significant stakeholder support. In …
FY20 Annual Result Disclosure.pdf
(PDF 136.62 KB)
Last updated: 21 Aug 2020
FY20 Annual Result Disclosure.pdf
… to the market Name of issuer TRANSPOWER NEW ZEALAND LIMITED Reporting Period 12 months to 30 June 2020 Previous … to our suppliers and offered deferred payment terms for transmission charges to affected customers. Ms Dunphy says … Cable replacement – all of which have been years in the planning and required significant stakeholder support. In …
FY20 Annual Result Disclosure.pdf
(PDF 136.62 KB)
Last updated: 03 Jul 2024
2024 SOSA - Final Appendices - Final Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 40 Appendix 6: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
2024 SOSA - Final Appendices - Final Version.pdf
(PDF 1.59 MB)
Last updated: 07 May 2024
2024 SOSA - Draft Appendices - Consultation Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 39 The Appendix 6: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
2024 SOSA - Draft Appendices - Consultation Version.pdf
(PDF 1.71 MB)
Last updated: 31 Jul 2024
Appendix B Study Methodology.pdf
… scenarios as the objective of the analysis is to test the transmission system’s limitations. These are during winter … the New Zealand grid is invaluable, and guidance for this report was solicited from those most familiar with these … the forecast developed for Transpower’s 2023 Transmission Planning Report (TPR) is used in these studies. However, it …
Appendix B Study Methodology.pdf
(PDF 517.41 KB)
Last updated: 04 Jul 2017
Appendix D - GIP GXP 2017 - FINAL.pdf
… Appendix D: Grid Exit and Injection Points 2017 Annual Planning Report © Transpower New Zealand Limited 2017. All rights … GXP Appendix D: Grid Exit and Injection Points 2 2017 Transmission Planning Report © Transpower New Zealand …
Appendix D - GIP GXP 2017 - FINAL.pdf
(PDF 57.03 KB)
Last updated: 31 May 2022
90. Trustpower Submission on REZ development.pdf
… a) The linkage between this work and the proposed new Transmission Pricing Methodology (TPM); b) Ensuring least … resources, land prices, transmission interconnection and planning conditions are all favourable, and multiple … given they are 2 We note a recent Concept Consulting report for the Authority identified as much as $500m of grid …
90. Trustpower Submission on REZ development.pdf
(PDF 349.74 KB)