Resources
Displaying 751 - 760 of 1207
Last updated: 27 Apr 2023
TPM Consultation NZGP phase 1 starting BBI customer allocations (KPMG technical assurance - HVDC Reactive Support).pdf
… All rights reserved. Independent Reasonable Assurance Report to the General Counsel and Company Secretary of … of the Electricity Industry Participation Code Amendment (Transmission Pricing Methodology) 2022. Information subject … Book”) dated 16 March 2023 and the requirements of the Transmission Pricing Methodology (“TPM”), as set out in …
Last updated: 19 Jan 2023
TPM HVDC Pole 2 starting customer allocations - technical assurance KPMG (January 2023).pdf
… All rights reserved. Independent Reasonable Assurance Report to the General Counsel and Company Secretary of … of the Electricity Industry Participation Code Amendment (Transmission Pricing Methodology) 2022. Information subject … Book”) dated 15 September 2022 and the requirements of the Transmission Pricing Methodology (“TPM”), as set out in …
Last updated: 14 Aug 2023
20230811 Final Submission on ETS and Permanent Forests Discussion Documents.pdf
… owns and operates New Zealand’s high voltage electricity transmission network (National Grid). 2 Transpower wishes to … via electronic transaction. 9 Transpower is responsible for planning, building, operating and maintaining the National … electricity supply, including during an emergency. 7 The Report of the Ministerial Inquiry into land uses associated …
Last updated: 26 Jul 2021
Untitled.pdf
… impaired to hear. MR raised an incident that had just been reported at Clyde substation where a disconnector which was … piece of work and this will be further developed into a Transmission industry case study in the next few weeks, with … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
Untitled.pdf
(PDF 9.8 MB)
Last updated: 18 Jul 2024
New Industrial Load Connections FAQ.pdf
… to maintain the integrity of New Zealand’s interconnected transmission system. While N connections (ie without a … find more information on constraints in our Transmission Planning Report. To understand the uncertainties at play when …
New Industrial Load Connections FAQ.pdf
(PDF 123.38 KB)
Last updated: 02 Nov 2022
May 2021 (1).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
May 2021 (1).pdf
(PDF 793.63 KB)
Last updated: 02 Nov 2022
May 2021.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report / Health, Safety & Wellbeing | Health & Safety … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
May 2021.pdf
(PDF 793.63 KB)
Last updated: 09 Aug 2023
20230808 Final Submission Strengthening NZ's critical infrastructure system Phase 1.pdf
… Document). It is difficult to overstate the importance of planning for resilient infrastructure, including electricity … risk reduction through modern designs that ensured transmission service was not interrupted even when the … certain resilience standards, by a certain time, and to report and/or be audited should be last resort. We accept …
Last updated: 24 May 2017
MEUG to TPNZ, Services Engagement Paper #2, 28-Apr-17.pdf
… of Transpower. If the measure were expressed as and reported as a target of unplanned interruptions per POS that … undertake efficiency and optimisation of outages within the planning horizon? Agree. MEUG members and MEUG would like as … Transpower’s proposed RCP3 measures in the Integrated Transmission Plan 2017 to be submitted to the Commerce …
MEUG to TPNZ, Services Engagement Paper #2, 28-Apr-17.pdf
(PDF 120.45 KB)
Last updated: 03 Sep 2018
Contact Energy submission.pdf
… period from 2020 to 2025 (RCP3). We agree that a strong transmission grid is important to New Zealand’s energy … If not, what other factors should we be considering when planning for the future of the grid? Yes. Transpower also … measure. Transpower mentions that the Transmission Planning Report identifies this type of risk but there is no measure …
Contact Energy submission.pdf
(PDF 471.9 KB)