Resources
Displaying 771 - 780 of 1207
Last updated: 29 Jul 2021
31 August 2018 PCBUs working together cs jm updated (003).pdf
… reconductoring project is replacing the conductors on two transmission lines between Haywards and Bunnythorpe … teams demonstrating good collaborative practice include: • Planning completed in advance of implementation tso ensure … a just and fair culture so as the team feel encouraged to report safety events without compromising quality Name Jon …
31 August 2018 PCBUs working together cs jm updated (003).pdf
(PDF 508.28 KB)
Last updated: 17 Aug 2017
Transpower releases 2016-17 annual results 17 August 2017.pdf
… to the inputs used in the calculation of our allowable transmission revenue under the regulatory arrangements set … the past 12 months. “A predominant theme this year was the planning and preparation for a future that is relatively … consumers of New Zealand. We are developing a number of reports and investigations around these to be released …
Transpower releases 2016-17 annual results 17 August 2017.pdf
(PDF 104.09 KB)
Last updated: 28 Feb 2020
Transpower Half Year Financial Statements to 31 Dec 2019.pdf
… Interim Report 2019/20 D .1 7 FINANCIAL STATEMENTS Six Months ended … line with the previous period’s result of $105.3 million. Transmission revenue declined 1.3% to $482.7 million (2018: … a process of continuous feedback, listening and action planning. The Commerce Commission continues to investigate …
Transpower Half Year Financial Statements to 31 Dec 2019.pdf
(PDF 392.17 KB)
Last updated: 10 Apr 2024
Guidance for developers establishing Solar Farms and BESS (Battery Energy Storage System) near Transpower Assets (V2)
… provided in the National Policy Statement on Electricity Transmission 2008 (NPSET); and • comply with the mandatory … panels) are not located within 12 metres each side of the transmission lines (National Grid Yard - NGY) or compromise … their own cost. Any EPR mitigation recommended in the final report should be considered in the design and construction …
Last updated: 06 Sep 2022
TP_Sub_2023_IMs_Review_Process_And_Issues_Paper_11July2022_Addendum.pdf
… to invest in the grid. These ‘game changers’ dominate our Transmission Tomorrow strategy, our Wakamana i Te Mauri Hiko … climate change scenarios are integrated into our strategic planning processes.11 To that end, we consider the Capex IM … affecting the Part 4 purpose). We have also attached a report prepared for Transpower by Frontier Economics …
Last updated: 12 Jul 2022
TP_Sub_2023_IMs_Review_Process_And_Issues_Paper_11July2022.pdf
… to invest in the grid. These ‘game changers’ dominate our Transmission Tomorrow strategy, our Wakamana i Te Mauri Hiko … climate change scenarios are integrated into our strategic planning processes.11 To that end, we consider the Capex IM … affecting the Part 4 purpose). We have also attached a report prepared for Transpower by Frontier Economics …
TP_Sub_2023_IMs_Review_Process_And_Issues_Paper_11July2022.pdf
(PDF 513.69 KB)
Last updated: 31 Jan 2025
Transpower Grid Exit Point (GXP) impact studies for Distributed Energy Resource (DER) development.pdf
… their Power Factor, or any other requirement, under its Transmission Agreement with Transpower (including schedule 8 … shared with Transpower’s Operational Engineering and System Planning teams who will review the study reports and confirm any changes required to Transpower …
Last updated: 27 Nov 2020
2020 11 17 Q&A - Trustpower on TPM Options Consultation.pdf
… for Transpower to provide a case study for a more complex transmission investment project? While a detailed case study … the third TPM issues paper. Attached is the relevant expert report from Dave Smith on this matter in case this is of … three categories of future generators used in transmission planning. Committed new generators, for which the specifics …
2020 11 17 Q&A - Trustpower on TPM Options Consultation.pdf
(PDF 274.52 KB)
Last updated: 27 Nov 2020
Q&A - Trustpower on TPM Options Paper.pdf
… for Transpower to provide a case study for a more complex transmission investment project? While a detailed case study … the third TPM issues paper. Attached is the relevant expert report from Dave Smith on this matter in case this is of … three categories of future generators used in transmission planning. Committed new generators, for which the specifics …
Q&A - Trustpower on TPM Options Paper.pdf
(PDF 274.52 KB)
Last updated: 14 Feb 2024
TPM - BBC Assumptions Book v1.2 - 14Feb2024 - clean.pdf
… 13 2.3.2 Transmission network … work/industry/grid-pricing/transmission-pricing-methodology/assumptions-book. … available information and trends. See Transmission Planning | Transpower TPM Transmission pricing methodology … is based on information in the 2021 Transmission Planning Report (TPR).15 2.3.2.3 HVDC transmission losses Assumption …
TPM - BBC Assumptions Book v1.2 - 14Feb2024 - clean.pdf
(PDF 3.66 MB)