Resources
Displaying 791 - 800 of 1234
Last updated: 18 Jun 2025
OTA-WKM - Appendix B - Demand and Generation Scenarios
… https://www.transpower.co.nz/our-work/industry/grid-pricing/transmission-pricing-methodology/assumptions-book TRANSPOWER … in the generation expansion model based on publicly reported development schedules. Table 2: Modelled Waikato … and upper North Island committed generation Type Modelled Transmission Node6 Name Capacity (MW) GridScaleSolar WHU110 …
Last updated: 06 Sep 2022
TP_Sub_2023_IMs_Review_Process_And_Issues_Paper_11July2022_Addendum.pdf
… to invest in the grid. These ‘game changers’ dominate our Transmission Tomorrow strategy, our Wakamana i Te Mauri Hiko … climate change scenarios are integrated into our strategic planning processes.11 To that end, we consider the Capex IM … affecting the Part 4 purpose). We have also attached a report prepared for Transpower by Frontier Economics …
Last updated: 12 Jul 2022
TP_Sub_2023_IMs_Review_Process_And_Issues_Paper_11July2022.pdf
… to invest in the grid. These ‘game changers’ dominate our Transmission Tomorrow strategy, our Wakamana i Te Mauri Hiko … climate change scenarios are integrated into our strategic planning processes.11 To that end, we consider the Capex IM … affecting the Part 4 purpose). We have also attached a report prepared for Transpower by Frontier Economics …
TP_Sub_2023_IMs_Review_Process_And_Issues_Paper_11July2022.pdf
(PDF 513.69 KB)
Last updated: 31 Jan 2025
Transpower Grid Exit Point (GXP) impact studies for Distributed Energy Resource (DER) development.pdf
… their Power Factor, or any other requirement, under its Transmission Agreement with Transpower (including schedule 8 … shared with Transpower’s Operational Engineering and System Planning teams who will review the study reports and confirm any changes required to Transpower …
Last updated: 30 Oct 2024
Pastoral Care Code of Practice Self-Review 2024 - Final.pdf
… 6660 Code contact Name Stephanie Pegg Job title Data and Reporting Analyst Email [email protected] … training is how to be safe and mentally aware in and around transmissions facilities – this requires teaching and … our FTE count to ensure we can continue to expand our planning, monitoring, and delivery of ākonga support. …
Pastoral Care Code of Practice Self-Review 2024 - Final.pdf
(PDF 713.43 KB)
Last updated: 27 Nov 2020
2020 11 17 Q&A - Trustpower on TPM Options Consultation.pdf
… for Transpower to provide a case study for a more complex transmission investment project? While a detailed case study … the third TPM issues paper. Attached is the relevant expert report from Dave Smith on this matter in case this is of … three categories of future generators used in transmission planning. Committed new generators, for which the specifics …
2020 11 17 Q&A - Trustpower on TPM Options Consultation.pdf
(PDF 274.52 KB)
Last updated: 27 Nov 2020
Q&A - Trustpower on TPM Options Paper.pdf
… for Transpower to provide a case study for a more complex transmission investment project? While a detailed case study … the third TPM issues paper. Attached is the relevant expert report from Dave Smith on this matter in case this is of … three categories of future generators used in transmission planning. Committed new generators, for which the specifics …
Q&A - Trustpower on TPM Options Paper.pdf
(PDF 274.52 KB)
Last updated: 14 Feb 2024
TPM - BBC Assumptions Book v1.2 - 14Feb2024 - clean.pdf
… 13 2.3.2 Transmission network … work/industry/grid-pricing/transmission-pricing-methodology/assumptions-book. … available information and trends. See Transmission Planning | Transpower TPM Transmission pricing methodology … is based on information in the 2021 Transmission Planning Report (TPR).15 2.3.2.3 HVDC transmission losses Assumption …
TPM - BBC Assumptions Book v1.2 - 14Feb2024 - clean.pdf
(PDF 3.66 MB)
Last updated: 12 Jun 2025
Redclyffe 220 kV Switchyard Resilience Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; … evidence that supports the rationales such as contracts, reports, memos, financial or other data, results of … investment is consistent with our latest Transmission Planning Report (2023), which is part of the suite of …
Last updated: 23 Aug 2024
240825 Submission ERP2 Transpower.pdf
… investment in and the build of generation, distribution and transmission investment and keep it up for decades. In doing … The energy sector needs clear and strong signals to start planning and delivering reductions in gross-emissions by … of 2024. 1 Boston Consulting Group, ‘Future is Electric’ report. 3 To enable this highly renewable energy future, an …
240825 Submission ERP2 Transpower.pdf
(PDF 256.03 KB)