Resources
Displaying 801 - 810 of 1207
Last updated: 31 May 2022
39. IEGA submission - Renewable Energy Zones National Consultation 8 April 2022.pdf
… renewable energy potential and are at the ‘edge’ of the transmission grid. We query whether introducing a new … due to the network companies and Transpower focusing on planning and investment scale to accommodate the large scale … interconnection and connection grid: Transpower’s Planning Report is a valuable resource where are the current and …
Last updated: 15 Apr 2025
USI - Attachment 4 - Options analysis
… period can be used where appropriate. Given that some transmission assets have lifespans exceeding 20 years, the … options and modelled projects, • cost of losses, including transmission and local losses, • reliability benefits, and • … Transpower’s investment options using either concept design reports or internal cost data, depending on the level of …
USI - Attachment 4 - Options analysis.pdf
(PDF 748.57 KB)
Last updated: 18 Dec 2024
USI - Attachment 4 - Preliminary Application of the Investment Test
… period can be used where appropriate. Given that some transmission assets have lifespans exceeding 20 years, the … options and modelled projects, • cost of losses, including transmission and local losses, • reliability benefits, and • … Transpower’s investment options using either concept design reports or internal cost data, depending on the level of …
Last updated: 20 Oct 2023
Exploring a biodiversity credit system for Aotearoa New Zealand
… owns and operates New Zealand’s high voltage electricity transmission network (the National Grid). 2 Thank you for … on the Discussion Document. 2 Transpower Integrated Report FY 2023, Powering Aotearoa New Zealand, p23. … vegetation can grow, or fall, into (or too close to) transmission lines. Trees coming into contact with …
Last updated: 11 May 2017
Gridlines_Issue 64_May 2017.pdf
… (40) Location: Project team based in Otaki, working on two transmission lines (total line length 236km) from … team: � Co-location � Outages and risk reduction � Up-front planning/good foundations � Compassionate work environment … hours with: � No recordable injuries � Good near-miss reporting � Good quality – requiring little rework � Good …
Gridlines_Issue 64_May 2017.pdf
(PDF 2.46 MB)
Last updated: 29 Sep 2020
AMP 2020.pdf
… 236 4.5 Transmission Lines … (ITP). The other supporting documents are the Transmission Planning Report (TPR) and the Grid Outputs Report. The purpose of the …
AMP 2020.pdf
(PDF 9.22 MB)
Last updated: 02 Nov 2022
February 2020.pdf
… 8 5 Priority 1 2 3 4 There were no High Potential Incidents reported in February. There were two recordable injuries … and equipment to undertake works in close proximity to our transmission lines. Work was stopped in both cases. The … Competent People Fitness for Work Permits, Licences Planning Tools & Equipment 8 2 2 9 7 Change & Emergency …
February 2020.pdf
(PDF 553.3 KB)
Last updated: 28 May 2021
TP_Sub_ComCom_RegulatoryReview_May2021.pdf
… the development and operation of New Zealand’s electricity transmission system. A key part of our strategy, alongside … lead to a decarbonised economy is set out in the March 2020 report, Whakamana i Te Mauri Hiko – Empowering our Energy … Zealand decarbonises. It considers the implications for the planning of the grid and the sector’s ability to deliver a …
TP_Sub_ComCom_RegulatoryReview_May2021.pdf
(PDF 237.37 KB)
Last updated: 13 Aug 2024
Risk management 2024
… closely with our service providers in the procurement, planning and delivery of work in the field and support this … to operate Keeping the public safe around our lines, transmission towers, and substations is a critical component … are provided in the notes to the financial section of this report. A specific financial risk relates to the fact that …
FY24 - Risk management.pdf
(PDF 209.79 KB)
Last updated: 30 Jul 2024
WBoP - Attachment 3 - Scenarios.pdf
… | July 2024 13 Figure 9: Process heat demand growth 2.1.7. Planning forecast To inform the timing of investment we have … in our NZGP 1.1 Major Capex Proposal18 and the 2023 Transmission Planning Report (TPR) 19. This was consulted on as part of our Upper …
WBoP - Attachment 3 - Scenarios.pdf
(PDF 2.43 MB)