2020 - Policy Statement - Information for feedback.pdf
… the system operator considers appropriate to observe in planning to comply, and complying with its principal … of Interest as part of its role, transparent management and reporting. Facilities have been made available to all … maintain system operation within the stated short- term transmission capability (as advised by grid owners) after a …
Last updated: 26 Mar 2021
2021 Annual Outage Protocol Forum .pdf
… NEW ZEALAND TODAY + TOMORROW 24 MARCH 2021 ANNUAL OUTAGE PLANNING FORUM 21/22 AG E N D A Part 1 1 Introduction Steven … dynamic reactive plant • Secondary System – protections • Transmission lines – line reconductoring, line dismantling … actions if an event develops. 1 % R is k C u rv e Increase reporting Develop outage watch list Identify grid …
Last updated: 15 Mar 2024
TP_Cross-Sub_IPP 2025_RCP4__IssuesPaper_March2024.pdf
… the average household bill, around 8%.2 A 25% increase in Transmission charges results in an approximate 2% increase … has used an Electricity Authority’s estimate of 10.5% as transmission proportion of the average household bill. This … 10. To be clear, our proposal would still require public reporting on the availability performance of the select HVAC …
Last updated: 28 Jun 2023
KPMG WUNIVM1a assurance opinion.pdf
… All rights reserved. Independent Reasonable Assurance Report to the General Counsel and Company Secretary of … of the Electricity Industry Participation Code Amendment (Transmission Pricing Methodology) 2022. Information subject … Book”) dated 16 March 2023 and the requirements of the Transmission Pricing Methodology (“TPM”), as set out in …
Last updated: 20 Aug 2021
NZGB slides 19 Aug.pdf
… New Zealand Generation Balance A planning tool for coordinating outages Provides forecast … available generation capacity (not on outage) • potential transmission constraints • peak demands • reserves required … short term models • N-1 and N-1-G scenarios • Our monthly reports How to track NZGB forecasts and our different …
Last updated: 19 Aug 2021
NZGB slides 19 Aug.pdf
… New Zealand Generation Balance A planning tool for coordinating outages Provides forecast … available generation capacity (not on outage) • potential transmission constraints • peak demands • reserves required … short term models • N-1 and N-1-G scenarios • Our monthly reports How to track NZGB forecasts and our different …
Last updated: 22 Mar 2021
Residual Charges and the Treatment of Batteries Options Consultation March 2021.pdf
… residual charge to grid-connected batteries under the new transmission pricing methodology (TPM) and potential options … Authority (Authority) released its final decision on its transmission pricing review and published new TPM Guidelines … on these matters. 5. The Authority also commissioned a report from Sense Partners on electricity storage and the …
Last updated: 22 Mar 2021
Residual Charges and the Treatment of Batteries Options Consultation March 2021 FINAL.pdf
… residual charge to grid-connected batteries under the new transmission pricing methodology (TPM) and potential options … Authority (Authority) released its final decision on its transmission pricing review and published new TPM Guidelines … on these matters. 5. The Authority also commissioned a report from Sense Partners on electricity storage and the …
Last updated: 16 Aug 2018
Unison Submission - TA Consultation - July 2018.pdf
… PO Box 1021 WELLINGTON Email: [email protected] TRANSMISSION ALTERNATIVES ENGAGEMENT PROCESS: CONSULTATION … TA’s that will meet the demand need. The Transmission Planning Reports will be the key information that TA providers will …
Last updated: 08 Jan 2018
TP_Sub_CapexIM_Draft_Determination_Appendix_A_21Dec2017.pdf
… 262622 SUBPART 1 Integrated transmission plan … asset management; (b) asset security; (c) augmentation and planning; Commented [TP26]: This definition no longer … key issues being addressed with reference to the planning report which is an ITP supporting document; (b) estimates of …