Resources
Displaying 821 - 830 of 1385
Last updated: 08 Mar 2023
Transpower submission: Price discovery in a renewables-based electricity system
… networks [MDAG partial support] Coordination with transmission investment that underpins the market While the … only we consider an omission for its context is the role of transmission capacity. Sufficient grid capacity is a key … to the status quo which will assist the SO in its security planning. In addition to Code development, this option would …
Last updated: 04 Aug 2025
TP_Sub_Reg_Roadmap_BESS_31July2025
… the Authority already has underway or was already planning to undertake. The most notable omission is several … providing IR can be greater than connection capacity during transmission outages. Because IR is procured at the island … the Code nor market system cater for the consideration of transmission capacity in the IR scheduling process. Manual …
Last updated: 09 Sep 2025
HVDC MCP - Attachment 1 - Compliance with the Capex IM
… investment need to be met, which may be either or both, a transmission investment or non-transmission solution; major … evidence that supports the rationales such as contracts, reports, memos, financial or other data, results of … investment is consistent with our latest Transmission Planning Report (2023), which is part of the suite of …
Last updated: 21 Aug 2020
FY20 Annual Result Disclosure.pdf
… to the market Name of issuer TRANSPOWER NEW ZEALAND LIMITED Reporting Period 12 months to 30 June 2020 Previous … to our suppliers and offered deferred payment terms for transmission charges to affected customers. Ms Dunphy says … Cable replacement – all of which have been years in the planning and required significant stakeholder support. In …
Last updated: 21 Aug 2020
FY20 Annual Result Disclosure.pdf
… to the market Name of issuer TRANSPOWER NEW ZEALAND LIMITED Reporting Period 12 months to 30 June 2020 Previous … to our suppliers and offered deferred payment terms for transmission charges to affected customers. Ms Dunphy says … Cable replacement – all of which have been years in the planning and required significant stakeholder support. In …
Last updated: 03 Jul 2024
2024 SOSA - Final Appendices - Final Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 40 Appendix 6: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 07 May 2024
2024 SOSA - Draft Appendices - Consultation Version.pdf
… 21 3.5 Inter-Island Transmission Assumptions … 39 The Appendix 6: Security of Supply Reporting … winter energy demand on a gross basis, inclusive of transmission losses and adjusted for demand response, where … Modelling team and align with those used for transmission planning and strategic planning. They are developed …
Last updated: 08 Nov 2023
Transpower submission - MBIE Advancing NZs energy transition - Electricity Market Measures - November 2023.pdf
… e-fuels. The sector needs to accelerate production and transmission and keep it up for decades. In doing so, … change considerations in their regulatory mandates. • The transmission investment test in the Capex Input Methodology … a stable, reliable grid while allowing for optimised planning solutions. • Changes are required to environmental …
Last updated: 31 Jul 2024
Appendix B Study Methodology.pdf
… scenarios as the objective of the analysis is to test the transmission system’s limitations. These are during winter … the New Zealand grid is invaluable, and guidance for this report was solicited from those most familiar with these … the forecast developed for Transpower’s 2023 Transmission Planning Report (TPR) is used in these studies. However, it …
Last updated: 04 Sep 2018
Mercury NZ Limited.pdf
… If not, what other factors should we be considering when planning for the future of the grid? Mercury agrees that in … supply and demand trends may warrant some “above forecast” transmission investments that relieve congestion and/or … in each class assessed as having poor health scores. This reporting could be enhanced further through identifying the …