Resources
Displaying 831 - 840 of 1234
Last updated: 23 Jun 2022
TPM Consultation reclassification of Buller region assets 23 June 2022.pdf
… region as connection assets under clause 23 of the new transmission pricing methodology (TPM).1 The new TPM will … diagram is figure 16-2 from Transpower’s Transmission Planning Report 2021. TRANSPOWER NEW ZEALAND | TPM CONSULTATION PAPER …
Last updated: 11 Feb 2025
TP_Sub_Resource_Management_Consenting and other_Amendments_Bill_10Feb2025
… to meet its emissions reduction targets; • Simplifying the planning system. 3 However, we are concerned that the … changes, is a step in the right direction to enabling the transmission activities that are needed to enable … (see also paragraphs 61-62 of the Supplementary Analysis Report). In this regard, section 171 has been amended to …
Last updated: 22 Dec 2022
Part D NI Backbone.pdf
… 220 kV grid backbone 2. SYSTEM CONDITIONS Transpower’s 2022 Transmission Planning Report (TPR) identified five system conditions which …
Part D NI Backbone.pdf
(PDF 1.38 MB)
Last updated: 09 May 2023
Submission on the review of the Electricity (Hazards from Trees) Regulations 2003
… to be, sustainable, reliable, resilient and efficient transmission of electricity. Recent severe weather events in … we consider that the tree owner should be obliged to report the risk to the line’s owner. Question 17: Do you … covenanted area (Kapiti Coast District) which included a planning report, ecological assessment, consent lodgement …
Last updated: 16 Dec 2022
Part G Resources.pdf
… of the committed project test set out in Part B of this report. Contingency Plan A plan that identifies power system … Code. Contingent events include the loss of any single transmission circuit or generating unit, but do not include … AOPO Asset Owner Performance Obligations APR Annual Planning Report AUFLS Automatic Under-Frequency Load …
Part G Resources.pdf
(PDF 1.44 MB)
Last updated: 30 Nov 2022
Transpower_RCP4_Consultation_webinar_presentation.pdf
… the longer term, as electricity usage increases, we expect transmission costs on a per kwh basis to reduce Note: This … Outcomes Service measures – the customer experience We are planning to deliver similar service levels during RCP4 as we … more asset classes. • New network risk measure providing a report on energy not served. • Additional measures around …
Transpower_RCP4_Consultation_webinar_presentation.pdf
(PDF 3.51 MB)
Last updated: 08 Apr 2020
TP Otahuhu–Whakamaru A&B line partial reconductoring Project - 7 Apr'20.pdf
… and B (OTA-WKM A and B) lines are an important part of the transmission network, connecting the Auckland network to … option. Chapter 8: Auckland Regional Plan 2019 Transmission Planning Report © Transpower New Zealand Limited 2019. All rights …
Last updated: 15 Sep 2022
BBC Assumptions Book v1.0 Decision paper September 2022.pdf
… BBC assumptions book (the assumptions book) under the new transmission pricing methodology (TPM).1 The assumptions … a.govt.nz/development/work-programme/pricing-cost-allocation/transmission-pricing-review/development/final-tpm-decision/ … tion-and-services/state-sector-leadership/guidance/financial-reporting-policies-and-guidance/discount-rates TRANSPOWER …
Last updated: 12 Feb 2021
11. 14 Dec 2020 - Letter from EA (Checkpoint 1 submission - Transitional Congestion Charge).pdf
… tools, (eg, GXP-level peak load forecasting used in its Transmission Planning Report) to assess the extent of congestion risk in the …
Last updated: 27 Feb 2019
Disclosure notice Transpower announces half-year results.pdf
… year results announcement to the market – 27 February 2019 Reporting Period 01 July 2018 to 31 December 2018 Previous … period. This was largely due to a decrease in regulated transmission revenue, driven by lower prices. Transmission revenue declined 7 per cent to $489.2 million …
Disclosure notice Transpower announces half-year results.pdf
(PDF 108.83 KB)