Resources
Displaying 851 - 860 of 1260
Last updated: 11 Feb 2025
TP_Sub_Resource_Management_Consenting and other_Amendments_Bill_10Feb2025
… to meet its emissions reduction targets; • Simplifying the planning system. 3 However, we are concerned that the … changes, is a step in the right direction to enabling the transmission activities that are needed to enable … (see also paragraphs 61-62 of the Supplementary Analysis Report). In this regard, section 171 has been amended to …
Last updated: 21 Oct 2022
TP_Sub_ACOT_TPM_code_amendments_20Oct2022.pdf
… the Electricity Authority’s consultation on Avoided cost of transmission ACOT – proposed TPM-related amendments, … distributed generation, following extensive changes to the transmission pricing methodology (TPM). Transpower, as the … efault/files/bulk-upload/documents/2022%20SOSA%20-%20Final%20Report%20-%20Final%20Version.pdf …
Last updated: 09 May 2023
Submission on the review of the Electricity (Hazards from Trees) Regulations 2003
… to be, sustainable, reliable, resilient and efficient transmission of electricity. Recent severe weather events in … we consider that the tree owner should be obliged to report the risk to the line’s owner. Question 17: Do you … covenanted area (Kapiti Coast District) which included a planning report, ecological assessment, consent lodgement …
Last updated: 22 Dec 2022
Part D NI Backbone.pdf
… 220 kV grid backbone 2. SYSTEM CONDITIONS Transpower’s 2022 Transmission Planning Report (TPR) identified five system conditions which …
Last updated: 30 Jul 2024
WBoP - Attachment 3 - Scenarios.pdf
… | July 2024 13 Figure 9: Process heat demand growth 2.1.7. Planning forecast To inform the timing of investment we have … in our NZGP 1.1 Major Capex Proposal18 and the 2023 Transmission Planning Report (TPR) 19. This was consulted on as part of our Upper …
Last updated: 20 Dec 2024
WBoP - Attachment 6 - Costing
… of the proposal and is a supporting attachment to our main report (‘Western Bay of Plenty Development Plan Major Capex … is for the near- term work required on the interconnected transmission grid only. 1 Approach to estimating capex We … project delivery procedures including governance oversight, planning, TRANSPOWER NEW ZEALAND | WESTERN BAY OF PLENTY …
Last updated: 16 Dec 2022
Part G Resources.pdf
… of the committed project test set out in Part B of this report. Contingency Plan A plan that identifies power system … Code. Contingent events include the loss of any single transmission circuit or generating unit, but do not include … AOPO Asset Owner Performance Obligations APR Annual Planning Report AUFLS Automatic Under-Frequency Load …
Last updated: 30 Nov 2022
Transpower_RCP4_Consultation_webinar_presentation.pdf
… the longer term, as electricity usage increases, we expect transmission costs on a per kwh basis to reduce Note: This … Outcomes Service measures – the customer experience We are planning to deliver similar service levels during RCP4 as we … more asset classes. • New network risk measure providing a report on energy not served. • Additional measures around …
Last updated: 08 Apr 2020
TP Otahuhu–Whakamaru A&B line partial reconductoring Project - 7 Apr'20.pdf
… and B (OTA-WKM A and B) lines are an important part of the transmission network, connecting the Auckland network to … option. Chapter 8: Auckland Regional Plan 2019 Transmission Planning Report © Transpower New Zealand Limited 2019. All rights …
Last updated: 12 Feb 2021
11. 14 Dec 2020 - Letter from EA (Checkpoint 1 submission - Transitional Congestion Charge).pdf
… tools, (eg, GXP-level peak load forecasting used in its Transmission Planning Report) to assess the extent of congestion risk in the …