Resources
Displaying 871 - 880 of 1352
Last updated: 20 Aug 2025
USI MCP - Attachment 4 - Application of the Investment Test
… and modelled projects; and • cost of losses, including transmission and local losses. The benefits and the … Transpower’s investment options using either concept design reports or internal cost data, depending on the level of … Practice (GEIP) and as such we have ensured that the planning and performance standards used to determine the …
Last updated: 09 Jun 2022
Solar PV in New Zealand.pdf
… to generate and store their own renewable electricity. This report considers how the National Grid will respond to a … is part of that approach. In our perspective document Transmission Tomorrow, we predicted that the role and … These factors could include differing sunshine hour rates, planning for new suburbs, and demographic and economic …
Last updated: 06 Oct 2023
20220721 Final submission on the Exposure Draft for the NPS-IB 2022 .pdf
… owns and operates New Zealand's high voltage electricity transmission network (the National Grid). The National Grid … Subpart 3: 3.24. The information requirements require the reporting ecologist to prepare a report to identify the … and identified taonga, once publicly identified in a planning instrument, as far as practicable and involve …
Last updated: 13 Mar 2017
CPK-WIL B Reconductor Attachment B - Options Costs.pdf
… options and costing report © Transpower New Zealand Limited 2007. All rights … – WILTON B RECONDUCTORING Attachment B OPTIONS AND COSTING REPORT Transpower New Zealand Limited [Report Date] Error! … 3 Non transmission options … 3 Transmission Options – enhance existing assets …
Last updated: 20 Jul 2023
TP_Sub_IMs_Draft_Decisions_19July2023.pdf
… at a time when significant investment in electricity transmission and distribution is required to achieve New … RAB indexation section and attached to this submission is a report from Frontier Economics on the suitability of the … propose resilience work. 107. Our capability in resilience planning has matured over the past 10-15 years. We now have …
Last updated: 30 Oct 2024
Pastoral Care Code of Practice Self-Review 2024 - Final.pdf
… 6660 Code contact Name Stephanie Pegg Job title Data and Reporting Analyst Email [email protected] … training is how to be safe and mentally aware in and around transmissions facilities – this requires teaching and … our FTE count to ensure we can continue to expand our planning, monitoring, and delivery of ākonga support. …
Last updated: 05 Aug 2025
Transpower NPS Renewable Energy Generation Submisision
… a more enabling regulatory framework for electricity transmission, which is crucial for New Zealand's … 1021 Wellington 6140 Attention: Daniel Hamilton, Strategic Planning Lead Email: [email protected] Phone: … co.nz/public/bulk-upload/documents/2025%20SOSA%20-%20Final%20Report.pdf?VersionId=tOo4Y8.kp2mloi9EOkUEDxkLDLv7Dxjt 4 July …
Last updated: 16 Oct 2019
Asset Owner Engineering Forum 2019 - No Refining NZ.pdf
… G E N E R AT I O N C O N N E C T I O N T I M E L I N E A Transmission connection B Generation commissioning C Market … A2 Investigation A3 Approval A4 Design and construction B1 Planning B2 Pre- commissi oning E2 CIC Commissioning B3 … Commissioning Plan OP test plan Asset capability assessment report Test Methodology D O C U M E N T T O B E P U B L I S …
Last updated: 20 Aug 2021
Long list consultation_NZGP1_20 August 2021.pdf
… (Staged) Investigation Long-list consultation and non-transmission solution request for information Date: 20/8/21 … and more information can be found in our Transmission Planning Report5. Question 1: Is our need description for this …
Last updated: 11 Nov 2020
Guidelines for Notifying and Publishing an Assessment.pdf
… additional security information to market participants in planning time is deemed prudent. This is to provide more up … effect of this constraint is to manage flows through all transmission lines into the upper North Island region for a … tool for HVDC energy assessments is the NZGB. An NZGB report is carried out monthly. For power limit calculations …