SoS Annual Assessment 2017.pdf
… 12 4.4 Inter-island Transmission Assumptions … 38 9.5 Transmission … it is not affected by NZAS load. The new generation options reported this year are comparable to those options reported last year. Overall, there has been a small increase …
SoS Annual Assessment 2017.pdf
(PDF 2.16 MB)
Last updated: 02 Nov 2022
August 2020.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 9/10/2020 H&S Performance 1/1 Health, Safety & … responsibilities. Initial discussions have taken place with transmission operators in the UK to discuss approach and to … Project will be Re-planned to commence in July. • Planning for July recommencement. • Identifying stakeholders …
August 2020.pdf
(PDF 633.35 KB)
Last updated: 24 Aug 2023
USI2 - Attachment 4 - Scenarios.pdf
… 30 3.6 Transmission network … South Island region. To apply the Investment Test and the Transmission Pricing Methodology (TPM), we must make … of boilers identified from the Mid-South Canterbury RETA report. Table 3 lists the major new developments we are … identified from the Mid-South Canterbury RETA report Ashburton 66 kV, Studholme and Timaru Disruptive …
USI2 - Attachment 4 - Scenarios.pdf
(PDF 2.7 MB)
Last updated: 15 Dec 2020
All submissions on TPM Options Consultation.pdf
… risk, and more about delivering low-cost electricity transmission to promote broader aspirations around economic … participants that can be expected to have a shorter term planning horizon (and hence require a higher discount rate) … Attached and to be read as part of this submission is a report by Mike Hensen of NZIER ‘TPM Development Options, …
All submissions on TPM Options Consultation.pdf
(PDF 7.48 MB)
Last updated: 01 Mar 2019
SoS Annual Assessment 2019 report.pdf
… 18 5.3 Inter-island Transmission Assumptions … 51 Transmission … monitoring and information provision, such as the weekly reporting of hydro levels relative to the hydro risk curves. … to the assumptions used in Transpower’s Te Mauri Hiko report—medium demand equates broadly to the Te Mauri Hiko …
SoS Annual Assessment 2019 report.pdf
(PDF 2.65 MB)
Last updated: 31 May 2022
24. ENA_submision-TP_REZ_consultation.pdf
… barriers to network connection. In particular, our members report that for many potential grid-scale solar schemes, the … (and to a lesser extent, new electricity loads) is the planning system. We encourage Transpower to work with … to export to a significant load market, but requiring the transmission infrastructure to cover the ‘last leg’ between …
24. ENA_submision-TP_REZ_consultation.pdf
(PDF 277.26 KB)
Last updated: 06 Apr 2020
SOSFIP consultation April 2020.pdf
… requirement for the Annual Security of Supply Assessment, a report that contains detailed supply and demand modelling … risk curves must— (a) assume full availability of installed transmission and generation assets, unless reasonably … operator’s assumptions, about— (i) existing generation and transmission capabilities; and (ii) expected generation and …
SOSFIP consultation April 2020.pdf
(PDF 444.03 KB)
Last updated: 04 Sep 2018
Counties Power Limited.pdf
… is an improved optimisation of Transpower’s current central planning approach to performance and funding. In so doing it … changes in the way that electricity is generated risking transmission over or under build; and (2) an increasing … over last decade is unclear. A PwC pricing analysis report for the Electricity Network Association (ENA) …
Counties Power Limited.pdf
(PDF 87.88 KB)
Last updated: 01 Nov 2023
20231101 Final Submission on pNPS for Natural Hazard Decision Making.pdf
… owns and operates New Zealand’s high voltage electricity transmission network (National Grid). Transpower welcomes … with regard to the maintenance, operation, upgrading, planning and development of the National Grid. 6 However, we … discretionary activity? Will require additional evidence or reports to be prepared for every application, could be an …
Last updated: 18 Mar 2020
2020 annual outage and customer forum.pdf
… Crawshay Customer survey Charlotte Edwards Annual Outage Planning Process Andrew Twaddle Questions Afternoon … primary plants. • Secondary system – protection. • Transmission lines – line reconductoring. N O R T H E R N N … tentative outages from the grid owner. • Refresh of Our Reporting: Ensuring our reports remain relevant and align …
2020 annual outage and customer forum.pdf
(PDF 2.23 MB)