Resources
Displaying 91 - 100 of 1295
Last updated: 17 Jul 2023
WBoP_Development_Plan_MCP_long-list_consultation-Attachment-1.pdf
… of Western Bay of Plenty region The Western Bay of Plenty transmission system is shown schematically in Figure 2. … and beyond can be found in Transpower’s 2022 Transmission Planning Report here. Note that our load forecast has changed since …
Last updated: 04 Mar 2020
Grid Outputs Report 2019.pdf
… GRID OUTPUTS REPORT 2019 Grid Outputs Report 2019 iii CONTENTS 1 … assets used to measure HVAC availability and outage planning measures AP2, AP3, and AP4 for RCP3 … with: • a summary of the performance of our regulated transmission business over the past disclosure year (July …
Last updated: 04 Mar 2020
Grid Outputs Report 2019.pdf
… GRID OUTPUTS REPORT 2019 Grid Outputs Report 2019 iii CONTENTS 1 … assets used to measure HVAC availability and outage planning measures AP2, AP3, and AP4 for RCP3 … with: • a summary of the performance of our regulated transmission business over the past disclosure year (July …
Last updated: 30 Jan 2020
Grid Outputs Report 2019.pdf
… GRID OUTPUTS REPORT 2019 Grid Outputs Report 2019 iii CONTENTS 1 … assets used to measure HVAC availability and outage planning measures AP2, AP3, and AP4 for RCP3 … with: • a summary of the performance of our regulated transmission business over the past disclosure year (July …
Last updated: 22 Feb 2022
2021 Asset Management Plan.pdf
… 222 4.4. Transmission Lines … (ITP). The other supporting documents are the Transmission Planning Report (TPR) and the Grid Outputs Report. The purpose of the …
Last updated: 22 Feb 2022
2021 Asset Management Plan.pdf
… 222 4.4. Transmission Lines … (ITP). The other supporting documents are the Transmission Planning Report (TPR) and the Grid Outputs Report. The purpose of the …
Last updated: 03 Sep 2021
Asset Management Plan 2021.pdf
… 222 4.4. Transmission Lines … (ITP). The other supporting documents are the Transmission Planning Report (TPR) and the Grid Outputs Report. The purpose of the …
Last updated: 14 Dec 2021
Atiamuri Project RMA Notification Decision Report.pdf
… NOTIFICATION AND DECISION REPORT FOR LAND USE CONSENT RM210390 & RM210391 PURSUANT TO … and operates New Zealand’s high voltage electricity transmission network – the National Grid – which links … Zoning The site is zoned Rural Environment as identified on Planning Map B4 of the District Plan, and shown on the map …
Last updated: 15 Jan 2019
November 2018 report.pdf
… asset capacity and grid configuration Annual Report 2017 - 2018 Pursuant to Electricity Industry … the hazards with operating large irrigation system near our transmission lines. 123 12-FEB-2018: OAM-BPT-WTK-1 tripped, … the hazards with operating large irrigation system near our transmission lines. 124 OAM-STU-BPD-WTK-2 B CCT 110 1.28 … Draft Outage Planning Policy …
Last updated: 09 Sep 2025
GHD HVDC Cable Replacement IER Report
… number 12668388 File name GHD HVDC Cable Replacement IER Report.docx Status Code Revision Author Reviewer Approved … reliability and capacity for the inter-island electricity transmission system. The upgrade is triggered by the age of … (GEIP) and regulatory expectations. Procurement and Planning The HVDC Link Upgrade Programme is currently in its …