Resources
Displaying 971 - 980 of 1295
Last updated: 12 Jun 2025
Redclyffe 220 kV Switchyard Resilience Attachment 4 - Costing
… and include expenses related to consenting and designation. Transmission lines construction works This includes material … replacements and costs are as advised by Transpower Asset Planning Management and can be considered as Class 4. 1 … • Technical reviews. • Performance monitoring and reporting. Transpower will allocate experienced management …
Last updated: 06 Dec 2022
4. Euroclass submission on RCP4 Consultation.pdf
… the above mentioned Transpower’s 110kV and 220kV transmission lines connecting directly into Transpower’s … servicing Auckland. The undergrounding of the transmission lines directly feeding into this critical … with Transpower to share the undergrounding feasibility report and discuss this matter further. Yours sincerely …
Last updated: 07 Aug 2025
Submission Te Waihanga Draft NIP- August 2025
… and avoid being a barrier to, electrification • Spatial planning provides an opportunity for Transpower, but it must … regulatory framework for planning and consenting of transmission infrastructure • A cohesive and enduring … and Conservation Authority 2024, Electric Homes Technical Report …
Last updated: 25 Oct 2023
20231018 Customer webinar v1.pdf
… covered in each session) Tim Duguid 2:40 – 2:45 Proposals, reports, analysis, papers… 5 Topic Presenter Time … Undertake grid asset strategy, asset management, asset planning, asset lifecycle management, and grid operations • … 73% 82% 4 Works delivery and outage planning 85% 75% 75% 5 Transmission network planning 70% 61% 81% 6 Contracting with …
Last updated: 19 Aug 2022
Major Electricity Users Group submission on NZGP1 Stage 1 shortlist.pdf
… as part of the MEUG submission is an independent expert report by Mike Hensen, Senior Economist, NZIER, “Net Zero … describe which generation options are precluded by each transmission option or the extent to which this difference … NZGP1 Scenarios and modelling results for an unconstrained transmission grid, December 2021’ (referred to in this …
Last updated: 26 Feb 2020
TP_Feedback_EA_Strategy_Development_24Feb2020.pdf
… objectives and blur their accountability.” In its Final Report the Panel stated that the Government “could issue a … wealth transfers when evaluating, for example, changes to transmission and distribution pricing.” New Zealand’s … quickly reflected in the Authority’s decision-making, work planning and approach to engagement with consumers, …
Last updated: 06 Mar 2020
191210 BOB-OTA regional MCP update.pdf
… Process step Timing Long-list consultation RFP for non-transmission solutions Short-list consultation MCP submitted … document. We published a Request for Proposals for non-transmission solutions on 7 June 2019. Following subsequent … capex proposal will include funding for the solution study report costs for Stage 2. We are not confident enough of the …
Last updated: 11 Dec 2017
Effect of Solar PV on Voltage Management in New Zealand.pdf
… 36 5.4 Effect of transmission faults on inverter ride through capability … 65 8.4 Long term planning … 97 A4.5 Effect of PV generation on transmission line loading for the summer scenario … voltage management and transient stability. Study reports have been produced for each of these areas, with …
Last updated: 18 Nov 2024
Interconnecting Transformer Review Methodology and Updates.pdf
… we published the 2024 Credible Event Review (CER) Scope report signalling what we would study during the 2024 … are commonly used assets in the New Zealand electricity transmission network. They enable connection between … means that if real-time conditions are different from our planning studies, potential security issues such as voltage …
Last updated: 03 Aug 2020
Whakamana i Te Mauri Hiko Brochure V2 SCREEN ART.pdf
… Whakamana i Te Mauri Hiko – Empowering our Energy Future report. The facts are now beyond dispute: New Zealand has a … change commitments. Rio Tinto’s announcement to start planning for the wind-down and eventual closure of New … help New Zealand avoid building more power stations and transmission lines than we need. Our brand and competitive …