Resources
Displaying 991 - 1000 of 1408
Last updated: 29 Jun 2023
Preparing for an increase in inverter-based resources v1.0.pdf
… electricity by 20301. In our Whakamana i Te Mauri Hiko report, which sets out our strategic context, we predict … electricity from remote generating stations through long transmission circuits to load centres. Our operational … MVA) respectively as published in the latest Transmission Planning Report17. Fault level was calculated assuming all …
Last updated: 02 Nov 2022
February 2022 (2).pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 1 dansonb Typewritten text 0 Health, Safety & … to work in “shift bubbles” to mitigate the risk of COVID-19 transmission. Workstation assessments continue to be offered … to the previous update due to December workload, replanning to meet revised due date.• Guidance notes being …
Last updated: 02 Nov 2022
February 2022.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 1 dansonb Typewritten text 0 Health, Safety & … to work in “shift bubbles” to mitigate the risk of COVID-19 transmission. Workstation assessments continue to be offered … to the previous update due to December workload, replanning to meet revised due date.• Guidance notes being …
Last updated: 17 Mar 2022
February 2022.pdf
… TP.HSW 01.13b Health, safety and wellbeing performance report 1 dansonb Typewritten text 0 Health, Safety & … to work in “shift bubbles” to mitigate the risk of COVID-19 transmission. Workstation assessments continue to be offered … to the previous update due to December workload, replanning to meet revised due date.• Guidance notes being …
Last updated: 28 Feb 2017
SoS Annual Assessment 2017.pdf
… 12 4.4 Inter-island Transmission Assumptions … 38 9.5 Transmission … it is not affected by NZAS load. The new generation options reported this year are comparable to those options reported last year. Overall, there has been a small increase …
Last updated: 20 Aug 2025
USI MCP - Attachment 7 - Stakeholder consultation
… of other stakeholder engagement activities – including non- transmission solutions – is summarised throughout the … on long list of options September 2023 Transmission Planning Report 2023 February 2024 Request for Proposals for …
Last updated: 15 Dec 2020
All submissions on TPM Options Consultation.pdf
… risk, and more about delivering low-cost electricity transmission to promote broader aspirations around economic … participants that can be expected to have a shorter term planning horizon (and hence require a higher discount rate) … Attached and to be read as part of this submission is a report by Mike Hensen of NZIER ‘TPM Development Options, …
Last updated: 24 Aug 2023
USI2 - Attachment 4 - Scenarios.pdf
… 30 3.6 Transmission network … South Island region. To apply the Investment Test and the Transmission Pricing Methodology (TPM), we must make … of boilers identified from the Mid-South Canterbury RETA report. Table 3 lists the major new developments we are … identified from the Mid-South Canterbury RETA report Ashburton 66 kV, Studholme and Timaru Disruptive …
Last updated: 23 Dec 2025
Proposed SOSFIP amendment - Relative to 15 Dec 2020 Version - December 2025 markup
… risk curves must— (a) assume full availability of installed transmission and generation assets, unless reasonably … operator’s assumptions, about— (i) existing generation and transmission capabilities; and (ii) expected generation and … energy and capacity margins. 11. Weekly security of supply report 11.1 The system operator must prepare and publishmake …
Last updated: 29 Sep 2017
TP_Sub_Additional_Information_Capex_IM_15August2017_Appendix.pdf
… capex are consistent with the- (a) most recent integrated transmission plan, and if there is any material divergence … category; F4 Governance Policies, processes and consultant reports (1) schedule listing governance all policies or … base capex programmes; (c) asset management; (d) business planning; or (e) capital works; (2) description of all …