Search
Displaying 1 - 2 of 2
Last updated: 10 Dec 2025
Transmission Expansion and Upgrade Options - Te Kanapu Technical Approach - V1.0 - December 2025
… Expansion and Upgrade Options Te Kanapu Technical Approach Version: 1.0 Date: December 2025 DOCUMENT REVIEW … to +100%). The box and whisker charts show the maximum and minimum expected values, the box indicates the range between … used for point-to-point power transmission over very long distances where the added costs of converter stations are …
Last updated: 16 Nov 2022
Operational impact assessment, Tiwai smelter closure - South Island transient angular stability.pdf
… locally, it will have to be transferred over longer distances to get to other parts of the power system … 12 months the South Island has registered a maximum and minimum demand of 2100 MW and 1100 MW respectively, of which … generating units at low MW output as this starts to approach the units rough running zone. 4.6 OPTIONS TO …