SP-OC-759 Outage planning policy.pdf
… Status: Issued Doc File Name:SP-OC-759 Outage planning policy.docx Printed on: 23/04/21 Location/version code: … would be assessed under the above principles. Monitoring compliance with this policy Transpower will monitor compliance with this policy through regular review and …
Last updated: 02 Oct 2023
SP-EA-003 Secondary Risk Policy.pdf
… Status: Issued Doc File Name:SP-EA-003 Secondary Risk Policy.docx Printed on: 02/10/23 Location/version code: … Limited Operations Division SP-EA-003 Secondary Risk Policy This Policy is part of the Engineering Assessment … when all tests have been carried out to demonstrate Code compliance are completed as defined in the Commissioning …
Last updated: 16 Apr 2025
GL-SD-004 Conflict of Interest.pdf
… 11 4.3 Monitoring Compliance with the Code and Breach Reporting … that Transpower may have under the Code, including as GO1. Policy/ Rules & Regulations ▪ Parts 7 and 8 of the Code2. ▪ … arrangements. ▪ Outage coordination. ▪ Monitoring compliance with the Code and reporting. ▪ Managing …
Last updated: 07 Jul 2025
GL-EA-953 Connection Study Requirements for Connecting a New Generating Station.pdf
… 11 3.6. Management of Non-compliance … Code), especially Part 8 ▪ the most up-to-date Certified Policy Statement ▪ our Generation Commissioning Process … repeated with new parameter values. Similarly, if any non- compliances or technical requirement violations occur during …
Last updated: 31 Jan 2025
Generation Connection Guide.pdf
… Information Trading System 1 See www.ea.govt.nz/code-and-compliance/the-code/ … http://www.ea.govt.nz/code-and-compliance/the-code/ Generation Connection Guide © … Lead-time 2 months Compliance No Resources WITS access policy C5 Advise clearing manager Description The Generator …
Last updated: 30 Jan 2025
GL-EA-959 Asset Capability Information Guideline.pdf
… information is used by the System Operator to: ▪ assess compliance of the assets against the obligations in the … documents in this series include: ▪ The System Operator’s Policy statement - The policies by which the System Operator … to the System Operator. https://www.ea.govt.nz/code-and-compliance/code/ …
Last updated: 17 May 2023
GL-EA-789 Interim Requirements for Connection of New Generation Technology.pdf
… Operations Reviewed By: Kevin Wronski, Principal Engineer Compliance Approved By: Louis Southin, Engineering Assurance … generators. Dispatch Notified Generation (DNG) is a lower-compliance form of market participation. Particularly, DNG … approval conditions is found in Part 13 the Code and the Policy Statement. Solar farms can be considered intermittent …
Last updated: 21 Aug 2024
PR-EA-010 Planned and Urgent Asset Testing.pdf
… Tool (with email as the backup method). Ÿ Ÿ Ÿ Ÿ Complete a Compliance Assessment Assess and review all test plans sent … the Security Coordinator : Operations Planning Assessment Compliance Assessment System Stability Assessment (where … received, resulting in test plans being agreed or rejected. Policy Test plans can only be agreed where the System …
Last updated: 13 Feb 2024
PR-RR-017 Providing Under Frequency Event Causer Recommendations.pdf
… process used to determine the amount of MW lost. External Policy/ Rules & Regulations The ‘Code’ Part 1 Definition for … Under Frequency Events ▪ PR-RR-015 Assessing Generator Compliance During Under Frequency Events 2 Definitions Under … (days) 21 days Document Control Business Group Owner: Compliance and Impartiality Prepared by (Writer/Reviewer): …
Last updated: 17 Mar 2025
GL-EA-303 Dispatch-capable load station approval process guidelines.pdf
… For Dispatch Notification Purchasers, clause 84P of the Policy Statement describes criteria required to be met by … days after the approval. https://www.ea.govt.nz/code-and-compliance/code/documents-incorporated-into-the-code/ … application form to [email protected] and compliance@ea.govt.nz with “DCLS Application” in the subject …