Search
Displaying 391 - 400 of 591
Last updated: 29 Sep 2020
ITP Narrative 2020.pdf
… both now and over the coming 10 years. 1 The 2020 ITP Compliance Report describes how this proposal document, … Narrative is structured as follows. In addition, regulatory compliance and detailed expenditure schedules are included … is changing the energy and electricity landscape, • public policy is influencing expectations of future growth, and • …
Last updated: 01 Aug 2024
Investigation Report.pdf
… their services and grant Transpower full access to conduct compliance audits. (f) Meet all health and safety … can request reporting and audit information to ensure compliance from service providers. 4.22 Details of the … temporary poles on the left. 9.22 Transpower’s spares policy86 defines its replacement structure and line spares …
Last updated: 13 Dec 2024
Low_Residual_Situation_Review_Consultation
… in energy and/or reserve. 11. In October 2024 a Government Policy Statement (GPS) to the Authority outlined the … as we will work with the Authority in responding to this policy guidance. 2. System Operator coordination of Low … event causing cascade failure, or otherwise compromising compliance with its Principle Performance Obligations …
Last updated: 06 Oct 2023
20220710 Final submission on the exposure draft changes to the NPS-FM and NES-F.pdf
… the intent of the amendments (as set out in the attached policy rationale document)? Are there unintended … is required between the NPS-FM and other national policy documents such as the National Policy Statement on … hydrological regime that is sufficiently detailed to enable compliance with paragraph (c) to be verified; and (c) the …
Last updated: 12 Dec 2024
Transpower Integrated Report FY24 final
… disclosures. The statement has been prepared in compliance with the standards published by the External … the lack of a cohesive energy strategy and supporting policy frameworks for the sector that address how we will … a key stakeholder, as are local authorities, which manage compliance of our work with the Resource Management Act …
Last updated: 28 Aug 2024
Transpower Integrated Report FY24.pdf
… disclosures. The statement has been prepared in compliance with the standards published by the External … the lack of a cohesive energy strategy and supporting policy frameworks for the sector that address how we will … a key stakeholder, as are local authorities, which manage compliance of our work with the Resource Management Act …
Last updated: 17 Apr 2025
Ancillary Services Consultation on Procurement Plan Review 2025
… System Operator, to Chris Otton, Manager Operations Policy, Electricity Authority, Procurement Plan review: … under which outages will not be considered in assessing compliance: 6.1. requirement for Planned Outage Coordination … Operator to allow a ± 1 MW tolerance for assessment of compliance during an event 16.3. test or performance data …
Last updated: 23 Oct 2025
TP_GO_Sub_CACTIS_Consultation_29Sept2025
… is updated for the asset. However, protection settings policy is governed by Schedule 8.3 Technical Code A clause … This updating requirement will introduce new and ongoing compliance and the impact to grid owner is significant; the … do this now, so it has significant resource, expediency, compliance and cost implications. 21 Chapter/Clause number …
Last updated: 02 Oct 2025
Grid Owner - CACTIS Submission
… is updated for the asset. However, protection settings policy is governed by Schedule 8.3 Technical Code A clause … This updating requirement will introduce new and ongoing compliance and the impact to grid owner is significant; the … do this now, so it has significant resource, expediency, compliance and cost implications. 21 Chapter/Clause number …
Last updated: 09 Nov 2023
GL-EA-766 Distribution Asset Test Requirements.pdf
… Plan Position Prepared By: Kevin Wronski, Principal Compliance Engineer, Rommel.Reyes Reviewed By: Louis … and validation of models, and by the system operator for compliance assessments, ancillary services performance … Details of any potential impacts to equipment capability or compliance with the Code expected during testing, ▪ …