Search
Displaying 411 - 420 of 573
Last updated: 15 Dec 2020
All submissions on TPM Options Consultation.pdf
… 1 Paragraph 136 of Part C TPM Development: Prudent Discount Policy | 11 December 2020 | Page 1 of 8 Transpower By email: … standards (where there has been a historic shortfall or non-compliance) should not be subject to benefit based … failing to properly account for congestion rentals and the compliance benefits associated with deterministic grid …
Last updated: 12 Jan 2026
20251127 2024 - 2025 Transpower Interconnection Asset Capacity and Grid Configuration Report
… (i) Version: 1.0 Date: 27/11/2025 Transpower - Quality and Compliance 2024 – 2025 Interconnection Asset Capacity and … 89 1.12 Outage Protocol Compliance Report … documents. These are: • Transpower’s Outage Planning Policy SP-OC-759 which clarifies how, in our dual roles as …
Last updated: 04 Nov 2024
GeoExchange NZ response to Transpower.pdf
… in a way that is consistent with regional and district policy (Section 9). Adopting best practise principles is … design, appropriate technology selection, and ensuring compliance of installation techniques (Section 9.4). A …
Last updated: 08 Jun 2023
AO Process Questionnaire
… ☐ 7. Environmental 7.1. All works must be undertaken in compliance with environmental consents/approvals, relevant … who can put you in contact with the relevant Environmental Policy and Planning Group person. Yes ☐ No ☐ Not Sure ☐ 7.3. …
Last updated: 07 Jul 2025
GL-EA-010 Generator Testing Requirements.pdf
… remains the responsibility of asset owners, as does compliance with all your obligations as stipulated in the … models; the system operator will use them to assess compliance and the performance of ancillary services, as … power system tools. https://www.ea.govt.nz/code-and-compliance/code/ …
Last updated: 05 Dec 2023
Monitoring Report - October 2023 FINAL V.pdf
… transport electrification is slowed by factors such as policy or technology Significant electrification fails to … there might be differ, especially as technology, costs, and policy considerations continue to evolve. This edition In … like Dispatchable Demand, but it requires a lower level of compliance, so it is intended to allow smaller load s …
Last updated: 10 Dec 2025
Future Grid Blueprint Methodology - Te Kanapu Technical Approach - V1.0 - December 2025
… determines a candidate expansion plan. 2. An operational policy is determined, and the dispatch of the electricity … dispatch models are used to: • determine an operating policy for hydro reservoirs • simulate the … is an input to a generation dispatch model. The operating policy considers the optimisation of hydro generation …
Last updated: 05 Nov 2025
Meridian submission - SOSFIP Review 2025
… Security of Supply Forecasting and Information Policy Review Meridian appreciates the opportunity to … paper ‘Security of Supply Forecasting and Information Policy (SOSFIP) Review – Draft amendment proposal’ … explained by a general risk aversion aimed at ensuring compliance with its resource consents. However, it is also …
Last updated: 26 Sep 2018
RMT_Specification_V6_issue.pdf
… dispatch (Five minute reserve modelling) Generator compliance monitoring and associated cost allocation … Contingent Event (ECE) are Risk Event types used in the Policy Statement to categorise and manage levels of risk. … are applicable. Within RMT any dispensation granted for non-compliance of a generator with Clause 8.19 is modelled and …
Last updated: 05 Jun 2024
SOROP Proposal Paper - 30 May 2024.pdf
… The SOROP is one of our key security of supply planning and policy documents. 5. The SOROP is intended to provide for … will be implemented (real time) (e) monitoring of compliance with the direction. 6.14 If no acknowledgement, … and the media (if required). [Revoked] Continuing compliance with other Code obligations 6.15 A specified …