Search
Displaying 121 - 130 of 156
Last updated: 28 Oct 2021
Atiamuri Series Reactors RC Application FINAL 20211027 with appendices.pdf
… Proposed Ātiamuri Series Reactors Transpower New Zealand Ltd October 2021 Address for Service: Transpower New … New generation capacity from the Tauhara 2 geothermal plant (152MW) and the Harapaki Wind Farm (176MW) is expected … 103 46 41 37 25 Concrete truck and pump 106 49 44 40 33 Mobile Crane (35T) operating 98 41 36 32 14 Mobile Crane …
Last updated: 03 May 2022
WiTMH Monitoring Report - Mar 22 - FINAL.pdf
… i Te Mauri Hiko Monitoring Report indicates how New Zealand is tracking against our energy futures In 2018 … Hiko series, visit https://www.transpower.co.nz/about- us/transmission-tomorrow The base case: Accelerated … (65%). There are several key factors at play: • Solar plants and batteries are faster to build than traditional …
WiTMH Monitoring Report - Mar 22 - FINAL.pdf
(PDF 620.87 KB)
Last updated: 03 May 2022
WiTMH Monitoring Report - Mar 22 - FINAL.pdf
… i Te Mauri Hiko Monitoring Report indicates how New Zealand is tracking against our energy futures In 2018 … Hiko series, visit https://www.transpower.co.nz/about- us/transmission-tomorrow The base case: Accelerated … (65%). There are several key factors at play: • Solar plants and batteries are faster to build than traditional …
WiTMH Monitoring Report - Mar 22 - FINAL.pdf
(PDF 620.87 KB)
Last updated: 21 Oct 2013
annual-regulatory-report-2012-13.pdf
… 2012/13 Annual Regulatory Report © Transpower New Zealand Limited 2013. All rights reserved. i Annual Regulatory … date Variance Material? Install 350MVAr static reactive plant at Otahuhu. 30 May 2008 30 May 2008 2009 Y N Establish … in a Bubble” RCP1 •forecast to commission capabilities for mobile & collaborative working •variance due to increased …
annual-regulatory-report-2012-13.pdf
(PDF 2.51 MB)
Last updated: 21 Oct 2019
TPR0003 Annual Review 2018-19 v11 Interactive 6.pdf
… of Directors, I am pleased to bring you this Annual Review and to share some of our successes and challenges over the … of $1,084.4 million. This was primarily driven by lower transmission revenue which dropped around five per cent from … Building /Facilities HospitalWastewater Treatment Plants SupermarketsMarket Retailers Sustainability …
TPR0003 Annual Review 2018-19 v11 Interactive 6.pdf
(PDF 14.86 MB)
Last updated: 22 Jan 2020
Transmission Planning Report 2019.pdf
… 2019 2019 Transmission Planning Report © Transpower New Zealand Limited 2019. All rights reserved. i Table of Contents 1 … Table 2-4: Existing grid-connected generation Generation plant Region Type Operating capacity in MW Grid injection … in n security. The substation allows connection of our mobile substation for transformer maintenance outages, …
Transmission Planning Report 2019.pdf
(PDF 6.89 MB)
Last updated: 12 Feb 2018
System Operator Annual Self-Review and Assessment 2016-17 Web.pdf
… SYSTEM OPERATOR ANNUAL SELF-REVIEW AND ASSESSMENT 1 JULY 2016 – 30 JUNE 2017 Version 1.2 … Contingency (CC) pressure threshold at Kapuni Gas Treatment Plant was breached. A CC was declared for approximately … usage of the system operator site has increased with our mobile data page and the CAN page having the greatest …
Last updated: 02 Apr 2020
TP Whakamana i Te Mauri Hiko.pdf
… Hiko – Energy Futures paper, which set out how New Zealand’s energy systems could lead the decarbonisation of New … and a wide range of industry stakeholders. We consulted transmission operators in other parts of the world from whom … under Paris Agreement in 2030 extended to 2050 based on planting an estimated 0.6m additional forestry hectares; …
TP Whakamana i Te Mauri Hiko.pdf
(PDF 7.93 MB)
Last updated: 01 Apr 2020
TP Whakamana i Te Mauri Hiko.pdf
… Hiko – Energy Futures paper, which set out how New Zealand’s energy systems could lead the decarbonisation of New … and a wide range of industry stakeholders. We consulted transmission operators in other parts of the world from whom … under Paris Agreement in 2030 extended to 2050 based on planting an estimated 0.6m additional forestry hectares; …
TP Whakamana i Te Mauri Hiko.pdf
(PDF 7.93 MB)
Last updated: 21 Nov 2023
RCP4 Independent Verification Report.pdf
… Independent verification report RCP4 base expenditure and service measures 2025-30 proposal Transpower New Zealand … 7-8 Panel arrangements 91 Table 7-9 Expected Long Lead Time Plant and Equipment 92 Table 7-10 Deliverability evaluation … services for security. Enhance cybersecurity practices for mobile and cloud services and integrate security analytics …
RCP4 Independent Verification Report.pdf
(PDF 11.18 MB)