Search
Displaying 21 - 30 of 156
Last updated: 10 Apr 2024
Guidance for developers establishing Solar Farms and BESS (Battery Energy Storage System) near Transpower Assets (V2)
… TRANSPOWER NEW ZEALAND | Guidance for developers establishing Solar Farms near … separation distances for buildings/structures, earthworks, mobile plant and people from transmission lines and support …
Last updated: 05 Jul 2023
Minimum Approach Distances - 110kV Lines on Towers
… 21m Table 1 – 110kV lines Safe distances for buildings and structures near conductors (wires) without engineering … No building/structure closer that 12m from any tower No mobile plant (eg digger, crane etc) within 4m of overhead …
110kV Lines on towers
(PDF 135.56 KB)
Last updated: 18 Sep 2024
Minimum Approach Distances - 110kV Lines on Poles
… 21m Table 1 – 110kV lines Safe distances for buildings and structures near conductors (wires) without engineering … closer that 8m to any pole or staywire No mobile plant (eg digger, crane etc) within 4m of overhead …
110kV Lines on Poles
(PDF 177.51 KB)
Last updated: 05 Jul 2023
Minimum Approach Distances - 220kV Lines on Towers
… 22.5m Table 1 – 220kV lines Safe distances for buildings and structures near conductors (wires) without engineering … No building/structure closer that 12m from any tower No mobile plant (eg digger, crane etc) within 4m of overhead …
220kV Lines on Towers
(PDF 220.62 KB)
Last updated: 05 Jul 2023
Hazards from Trees
… description of the dangers posed by contact between trees and live conductors and on the cutting and trimming of trees … is also dangerous to build, construct, excavate, or operate mobile plant close to conductors and the support structures. The …
TP Hazards from Trees-28June'13 - A4.pdf
(PDF 39.61 KB)
Last updated: 06 Oct 2023
20220721 Final submission on the Exposure Draft for the NPS-IB 2022 .pdf
… Box 10362 Wellington 6143 Submission of Transpower New Zealand Limited on the Exposure Draft of the NPS-IB Thank you … advice that this is a preferable alternative to replacement planting with nursery sourced plants, which has risks of … environments. Transpower notes the exception for ‘highly mobile fauna’ in provision 1.3(2)(b), and makes submissions …
Last updated: 15 Jan 2025
2025.01.15 Safety Alert - Worker Received Induction Electric Shock
… transmission lines team was tasked with re-insulating and replacing dead ends on a transmission structure. The … 2 years). Supporting References: TP. SS 07.23 Worksite and mobile plant temporary earthing and equipotential bonding of …
Last updated: 20 Nov 2024
2024.11.20 First Alert - Electric Shock Caused by Induction
… removed one half of the bridging bond across the jumpers and broke the equipotential zone. What could have happened? … & Safety Supporting References: TP.SS 07.23 Worksite and mobile plant temporary earthing and equipotential bonding of …
2024.11.20 First Alert - Electric Shock Caused by Induction.pdf
(PDF 142.53 KB)
Last updated: 29 Aug 2023
2023_08_28 Digger encroached 11kV mad.pdf
… eliminated ensure that a close approach consent is in place and the network owner’s requirements are adhered to. ➢ … NZECP 34 Section 5 Safe distances for the operation of mobile plant near conductors For more information Therese Carroll, …
2023_08_28 Digger encroached 11kV mad.pdf
(PDF 173.33 KB)
Last updated: 02 Nov 2022
February 2021 (1).pdf
… 12 Month Vehicles Contact With Electricity Machinery & Plant Stored Mechanical Energy Hazardous Substances Falling … to the HPIFR. 2.76 Year To Date Number of Serious Injuries and High Potential Incidents (L1&2) by Critical Risk Injury … barriers, and “TWO-WAY” communications may be mandatory for mobile plant works which are outside MAD, but under or …
February 2021 (1).pdf
(PDF 825.92 KB)