Search
Displaying 81 - 90 of 156
Last updated: 22 Nov 2018
Asset Management Plan 2018 - FINAL.pdf
… 22 2.3 Information and Communications Technology (ICT) expenditure … vehicles, and other equipment including laptops and mobile phones used for our day to day operations that are … distances to energised equipment. Therefore, additional plant is required to be removed from service to complete …
Asset Management Plan 2018 - FINAL.pdf
(PDF 19.79 MB)
Last updated: 01 Aug 2023
TP_SystemOperatorStrategicPlan_Jun23_03_FINAL-A.pdf
… Operator Strategic Plan 2023 June 2023 TRANSPOWER NEW ZEALAND | SYSTEM OPERATOR SERVICE STRATEGIC PLAN 2 Contents 1.0 … security-constrained economic dispatch of large generation plant and demand users – scheduling and dispatching the … at lower cost than grid- connected generation and transmission assets? Using this evidence from overseas, we …
TP_SystemOperatorStrategicPlan_Jun23_03_FINAL-A.pdf
(PDF 5.09 MB)
Last updated: 01 Jul 2024
J56094 - TP System Operator Strategic Plan 2024 02_Final.pdf
… System Operator Strategic Plan June 2024 2TRANSPOWER NEW ZEALAND | SYSTEM OPERATOR STRATEGIC PLAN Contents Foreword … owners when they are commissioning and refurbishing their plant and monitor its operation against performance … that power the electricity system are changing, being more mobile, connected and flexible, and less likely to commit to …
Last updated: 28 Aug 2023
Transpower FY23 Integrated Report.pdf
… Integrated Report FY 2023 Powering Aotearoa New Zealand D .17 Building connections today, for generations to … our interactive enquiries dashboard and optimised this for mobile phone use. We think Transpower has developed a robust … entered the reserves market with a 40 MW virtual power plant load from 10,000 household battery systems. Other …
Transpower FY23 Integrated Report.pdf
(PDF 12.31 MB)
Last updated: 02 Sep 2022
Distributed Energy Resources - Understanding the potential - main report - final_0.pdf
… Distributed Energy Resources – Understanding the potential Main report David Reeve, Corina … 17 Table 6 - Cost assumptions for a geothermal plant … realises that this has implications for the energy market, transmission utilisation, dispatch, security, reliability, … such as responsive load and storage (stationary or mobile batteries), available as a source of instantaneous …
Last updated: 08 Sep 2020
Distributed Energy Resources - Understanding the potential - main report - final.pdf
… Distributed Energy Resources – Understanding the potential Main report David Reeve, Corina … 17 Table 6 - Cost assumptions for a geothermal plant … realises that this has implications for the energy market, transmission utilisation, dispatch, security, reliability, … such as responsive load and storage (stationary or mobile batteries), available as a source of instantaneous …
Last updated: 07 Sep 2020
Distributed Energy Resources - Understanding the potential - main report - final.pdf
… Distributed Energy Resources – Understanding the potential Main report David Reeve, Corina … 17 Table 6 - Cost assumptions for a geothermal plant … realises that this has implications for the energy market, transmission utilisation, dispatch, security, reliability, … such as responsive load and storage (stationary or mobile batteries), available as a source of instantaneous …
Last updated: 31 Aug 2020
Distributed Energy Resources - Understanding the potential - main report - final.pdf
… Distributed Energy Resources – Understanding the potential Main report David Reeve, Corina … 17 Table 6 - Cost assumptions for a geothermal plant … realises that this has implications for the energy market, transmission utilisation, dispatch, security, reliability, … such as responsive load and storage (stationary or mobile batteries), available as a source of instantaneous …
Last updated: 01 Oct 2021
Transmission Planning Report 2021.pdf
… 2021 Transmission Planning Report © Transpower New Zealand Limited 2021. All rights reserved. 1 TABLE OF CONTENTS 1 … For example, in 2016, Pacific Steel closed its Otahuhu plant and Holcim Cement ceased operation at Westport. In … in n security. The substation allows connection of our mobile substation for transformer maintenance outages, …
Transmission Planning Report 2021.pdf
(PDF 7.91 MB)
Last updated: 03 Sep 2021
Transmission Planning Report 2021.pdf
… 2021 Transmission Planning Report © Transpower New Zealand Limited 2021. All rights reserved. 1 TABLE OF CONTENTS 1 … For example, in 2016, Pacific Steel closed its Otahuhu plant and Holcim Cement ceased operation at Westport. In … in n security. The substation allows connection of our mobile substation for transformer maintenance outages, …
Transmission Planning Report 2021.pdf
(PDF 7.91 MB)