Publications and resources
Resources search
-
Managing Electrical Hazards
...
- 28 September 2021
-
Info Sheet Civil EHMP.pdf [ pdf 384.4 KB ]
-
2021 Auckland Strategy
Work we’re doing now to futureproof Auckland’s electricity grid.
- 09 June 2021
-
Transpower Auckland Strategy 2021 [ pdf 7.32 MB ]
-
Best practice forest management – trees and transmission lines
A best practice guide on the management of trees around transmission lines.
- 19 January 2021
-
Best practice forest management.pdf [ pdf 590.72 KB ]
-
Public Helicopter Use around Transmission Lines
Flying near power lines is dangerous as the conductors (wires) can be difficult to see.
- 14 December 2020
-
Helicopter user near transmission lines [ pdf 513.59 KB ]
-
2019/20 Annual Report and Review
Our 2019/20 Annual Report is a print-friendly PDF file that includes our corporate governance and financial statements,...
- 29 September 2020
-
Transpower Annual Report 2019-20.pdf [ pdf 5.16 MB ]
-
Earth Potential Rise (EPR) Mitigation Information Sheet
In the rare event of a lightning strike or fault on the transmission line, towers or poles may transfer high voltage and dangerous currents into the ground for a very short instant. This is...
- 05 May 2020
-
Earth Potential Rise Info Sheet.pdf [ pdf 1.46 MB ]
-
Keeping the power grid safe from solar storms
Transpower is playing a key role is determining how best to protect vulnerable power grids from devastating geomagnetic storms caused by extreme solar activity.
- 06 May 2019
-
TP Innovation - Solar Flares May 2019.pdf [ pdf 2.24 MB ]
-
Protecting our critical equipment
The performance of our HVDC link directly affects our Grid and wholesale electricity market. Anything we do to improve the efficiency and robustness of this link provides value to all...
- 30 March 2019
-
TP Innovation - Protecting our Critical Equipment March 2019.pdf [ pdf 2.37 MB ]
-
2018 Transmission Planning Report
Transpower regularly publishes a Transmission Planning Report (TPR) which details the grid asset capability over the next 15 years. ...
- 04 February 2019
-
Transmission Planning Report 2018 - FINAL - 22 Nov 2018.pdf [ pdf 16.9 MB ]
-
Kanban breaks the backlog
Over the last year, our Enterprise Services Support (ESS) team has used Kanban to significantly reduce incident turnaround times.
- 12 December 2018
-
TP Innovation - Kanban breaks the backlog.pdf [ pdf 826.18 KB ]
Refine search:
Publication type
- (-) Remove Safety resources filter Safety resources
- (-) Remove Project factsheets filter Project factsheets
- (-) Remove Corridor management resources filter Corridor management resources
- Corporate publications (33) Apply Corporate publications filter
- Landowner resources (16) Apply Landowner resources filter