Publications and resources
Resources search
-
Value of Lost Load (VoLL) study
We have undertaken an investigation of the Value of Lost Load (VoLL) to inform our expenditure decisions and regulatory applications. ...
- 21 November 2018
-
Value of Lost Load (VoLL) Study - June 2018.pdf [ pdf 2.23 MB ]
-
Report on 2 March 2017 South Island AUFLS Event
On 2 March 2017, New Zealand experienced a major and complex power system event. The event resulted in the South Island power system splitting into two separate systems.
- 09 July 2018
-
Mycoplasma bovis Information sheet
This information sheet provides important information on Mycoplasma bovis and best practice measures in its containment.
- 09 April 2018
-
Mycoplasma Bovis Information Sheet [ pdf 577.9 KB ]
-
Biosecurity Information Sheet
This information sheet details Transpower's measures around biosecurity.
- 28 September 2017
-
Biosecurity Information Sheet [ pdf 636.53 KB ]
-
Plantation forestry near transmission lines
This factsheet provides information on the issues surrounding the growing and harvesting of forestry near transmission lines.
- 29 August 2017
-
Plantation Forestry Information Sheet [ pdf 693.27 KB ]
-
Market impact assessment from changes to HVDC cost allocation
The methodology to allocate the HVDC costs to South Island (SI) generators was changed in 2015.
- 12 June 2017
-
Scientia_Market_Impact_HAMI_SIMI.pdf [ pdf 1.49 MB ]
-
Minimum Approach Distance Guidelines
The Electricity Code of Practice provides minimum approach distances in and around transmission structures and conductors. These diagrams provide quick guidance and reference on minimum...
- 22 March 2017
-
Minimum Approach Distances for 220 kV Towers [ pdf 220.62 KB ]
-
Ten Year Forecast of Fault Levels
This publication presents an update to the ten year forecast fault levels report. The Connection Code contained in Schedule 8 to the Benchmark Agreement requires Transpower to publish a...
- 30 September 2016
-
2016 ten year forecast fault level report.pdf [ pdf 2.16 MB ]
-
The Development Guide
This guide provides information on the types of issues that development near National Grid lines can have on the lines and, conversely, the issues National Grid lines can have on development....
- 14 July 2016
-
The Development Guide - Full [ pdf 13.74 MB ]
-
HVDC bi-pole trip and change to under frequency reserve risk: technical commentary
On 11 December Transpower’s HVDC equipment suffered a bi-pole trip while transferring 90 MW to the North Island. The cause was unexpected and, while an explanation was ...
- 01 March 2016
-
3190 HVDC Bipole Trip 11 Dec 2015 Technical Commentary.pdf [ pdf 541.39 KB ]
Refine search:
Category
- (-) Remove Landowners filter Landowners
- (-) Remove Industry information filter Industry information
- Resources (7) Apply Resources filter
Publication type
- (-) Remove Technical reports filter Technical reports
- (-) Remove Corridor management resources filter Corridor management resources
- Landowner resources (14) Apply Landowner resources filter
- Safety resources (6) Apply Safety resources filter
- Corporate publications (5) Apply Corporate publications filter
- Pricing publications (1) Apply Pricing publications filter
- Results and reports (1) Apply Results and reports filter