Publications and resources
Resources search
-
Annual Report 2008/09
This report describes Transpower’s financial and operational performance for the financial year ending 30 June 2009.
- 30 June 2009
-
Annual Report 2008/09 [ pdf 862.17 KB ]
-
Transpower Finance Ltd: Directors Report for 2009
The Directors of Transpower Finance Limited present their report to the shareholders for the year ended 30 June. The principal activity of Transpower Finance is financing on behalf of the...
- 30 June 2009
-
Transpower Finance Ltd: Directors Report for 2009 [ pdf 2.15 MB ]
-
Guide to Transpower
This booklet is for those who want to learn more about the major transmission assets owned and operated by Transpower and the company's role in the New Zealand electricity industry. ...
- 14 April 2009
-
Guide to Transpower [ pdf 757.15 KB ]
-
Transmission Pricing 2009
From April 2008, Transpower is required to use the Electricity Authority's Transmission Pricing Methodology (TPM) to allocate Transpower's revenue requirement via connection,...
- 01 April 2009
-
Transmission Pricing 2009 [ pdf 12.81 KB ]
-
Guide to Electrical Safety for Emergency Personnel
Guidance on avoiding electrical hazards in incidents that involve any electricity network or other installations.
- 01 April 2009
-
Guide to Electrical Safety for Emergency Personnel [ pdf 2.58 MB ]
-
Quality Performance Report 2008/09
This is Transpower New Zealand Limited’s annual Quality Performance Report. It sets out operational data that enables Transpower’s stakeholders to make an assessment of the...
- 01 January 2009
-
Quality Performance Report 2008/09 [ pdf 826.88 KB ]
-
Information for Disclosure 2008
The Electricity (Information Disclosure) Regulations 1999 form part of the Government's regulatory regime for the electricity sector. The purpose and nature of these Regulations is...
- 28 November 2008
-
Information for Disclosure 2008 [ pdf 6.79 MB ]
-
LECG Review of Grid Investment Approval Procedures
LECG has reviewed the current grid investment approval procedures and identified some key deficiencies in the regulatory framework for transmission investment.
- 19 November 2008
- View more resources
-
Energy use forecasting for heat pumps 2008
In 2008 BRANZ Ltd undertook a heat pump study report titled Active Cooling and Heat Pump Use in New Zealand.
- 05 November 2008
-
Peak Load and total energy use forecasting for heat pumps (QC5112) [ pdf 658.17 KB ]
-
Compliance Statement 2008
This Compliance Statement was prepared by Transpower to demonstrate to the Commission its compliance or otherwise, with the Commerce Act (Transpower Thresholds) Notice 2008 and the Deed of...
- 25 September 2008
-
Compliance Statement 2008 [ pdf 2.93 MB ]
Refine search:
Publication type
- (-) Remove Pricing publications filter Pricing publications
- (-) Remove Corridor management resources filter Corridor management resources
- Corporate publications (76) Apply Corporate publications filter
- Landowner resources (18) Apply Landowner resources filter
- Safety resources (11) Apply Safety resources filter
- Project factsheets (8) Apply Project factsheets filter
- Electric and magnetic fields (EMF) (6) Apply Electric and magnetic fields (EMF) filter
- Technical reports (6) Apply Technical reports filter
- Presentations (2) Apply Presentations filter