Publications and resources
Resources search
-
Asset Management Plan 2016
A supporting document to our 2016 Integrated Transmission Plan, the Asset Management Plan explains how we undertake asset management.
- 01 September 2016
-
Asset Management Plan 2016.pdf [ pdf 1.67 MB ]
-
The Development Guide
This guide provides information on the types of issues that development near National Grid lines can have on the lines and, conversely, the issues National Grid lines can have on development....
- 14 July 2016
-
The Development Guide - Full [ pdf 13.74 MB ]
-
Statement of Corporate Intent 2016/17
This Statement of Corporate Intent (SCI) is submitted by the Board of Directors of Transpower New Zealand Limited, in accordance with Section 14 of the State-Owned Enterprises Act 1986. ...
- 11 July 2016
-
Transpower Statement of Corporate Intent 2016/17 [ pdf 603.48 KB ]
-
Working on Your Land
This booklet provides rural landowners/occupiers with information about how to work with transmission lines on your land.
- 01 July 2016
-
Working on Your Land [ pdf 6.68 MB ]
-
Grid Reliability, Economic Investment and Fault Level Report
The Electricity Industry Participation Code (the Code) requires Transpower to publish the Grid Reliability Report (GRR), Grid Economic Investment Report (GEIR) and the ten year forecast fault...
- 01 May 2016
-
2016 GRR GEIR April update.pdf [ pdf 1 MB ]
-
2015 Asset Management Plan
The 2015 Asset Management Plan explains how we undertake asset management and describes our plans for 16 different asset classes.
- 14 April 2016
-
2015 Transpower Asset Management Plan [ pdf 2.42 MB ]
-
Irrigators and Transmission Lines
This brochure provides guidance to operating large irrigators near existing overhead high voltage transmission lines, and suggests ways to avoid electrical hazards.
- 01 April 2016
-
Irrigators and Transmission Lines.pdf [ pdf 211.97 KB ]
-
2015 / 16 Interim Report
This Interim Report outlines the results of the first financial year (2015/16) of the second Regulatory Control Period (RCP2).
- 23 March 2016
-
Interim report FINAL.pdf [ pdf 773.58 KB ]
-
Health and Safety: Responsibilities of Landowners / Occupiers
Whether you are a landowner or an occupier, if you carry out a business or undertaking on your land then from 1 April 2016 you will be a “PCBU” under the Health and...
- 04 March 2016
-
Landowner Information Sheet Health and Safety [ pdf 198.28 KB ]
-
HVDC bi-pole trip and change to under frequency reserve risk: technical commentary
On 11 December Transpower’s HVDC equipment suffered a bi-pole trip while transferring 90 MW to the North Island. The cause was unexpected and, while an explanation was ...
- 01 March 2016
-
3190 HVDC Bipole Trip 11 Dec 2015 Technical Commentary.pdf [ pdf 541.39 KB ]
Refine search:
Category
- (-) Remove Transmission assets filter Transmission assets
- (-) Remove Strategy and planning filter Strategy and planning
- (-) Remove Industry information filter Industry information
- Resources (87) Apply Resources filter
- Landowners (13) Apply Landowners filter
- Investors (3) Apply Investors filter
- Safety (3) Apply Safety filter
- Community (1) Apply Community filter
Publication type
- (-) Remove Corporate publications filter Corporate publications
- (-) Remove Landowner resources filter Landowner resources
- Results and reports (35) Apply Results and reports filter
- Safety resources (15) Apply Safety resources filter
- Corridor management resources (2) Apply Corridor management resources filter
- Technical reports (2) Apply Technical reports filter
- Pricing publications (1) Apply Pricing publications filter
- Project factsheets (1) Apply Project factsheets filter