Asset Capability Statements (ACS)
Information for asset owners on providing asset capability statements
Asset testing
Information required from asset owners ahead of the testing of their assets
Automatic under-frequency load shedding (AUFLS)
Information about the automatic under-frequency load shedding (AUFLS) scheme that protects against system collapse.
Commissioning Generation
The System Operator's commissioning generation process
Connected Asset Commissioning, Testing and Information Standard (CACTIS)
CACTIS is the System Operator’s core technical standard that defines what information, testing, modelling, and commissioning steps asset owners must complete.
Dispensations and equivalence arrangements
Apply for a dispensation or equivalence arrangement if you are not able to comply with a Code requirement
Paralleling GXPs
Information for assessing and putting in place parallel connections.
Power System Studies and Modelling
Guidance for conducting power system studies and submitting and validating mathematical models of assets for system operator approval.